Competency | Competency Requirements | Upload Requirements | Examples |
---|
Welder Certificate AS 1796-2001 - No 1 Anchor |
---|
| wedlercertasno1 |
---|
| wedlercertasno1 |
---|
|
| - Applicants name must be displayed on evidence and this must match the applicants registered name in Onsite
- A certificate or card can be accepted
- Must show completion of Manual metal-arc welding (MMAW) of welds in carbon steel plate and carbon steel pipe over 600 mm outside diameter (single vee welded from both sides).
- If card is uploaded, both sides of card should be displayed in uploaded file
- Evidence must be issued by a registered training organisation (RTO)
- There must be an indication of the number that the applicant was certified in
- Black and white or colour copy can be accepted
| - Date of completion shown on the evidence should be recorded in Onsite as the Issue Date
| |
Anchor |
---|
| weldercertasno1e |
---|
| weldercertasno1e |
---|
|
Welder Certificate AS 1796-2001 - No 1E | - Applicants name must be displayed on evidence and this must match the applicants registered name in Onsite
- A certificate or card can be accepted
- Must show completion of Manual metal-arc welding (MMAW) of welds in carbon steel plate and carbon steel pipe over 270 mm outside diameter (single vee welded from one side only).
- If card is uploaded, both sides of card should be displayed in uploaded file
- Evidence must be issued by a registered training organisation (RTO)
- There must be an indication of the number that the applicant was certified in
- Black and white or colour copy can be accepted
| - Date of completion shown on the evidence should be recorded in Onsite as the Issue Date
| |
Welder Certificate AS 1796-2001 - No 2 Anchor |
---|
| weldercertasno2 |
---|
| weldercertasno2 |
---|
|
| - Applicants name must be displayed on evidence and this must match the applicants registered name in Onsite
- A certificate or card can be accepted
- Must show completion of Manual metal-arc welding (MMAW) of welds in carbon steel pipe (single vee weld from one side only).
- If card is uploaded, both sides of card should be displayed in uploaded file
- Evidence must be issued by a registered training organisation (RTO)
- There must be an indication of the number that the applicant was certified in
- Black and white or colour copy can be accepted
| - Date of completion shown on the evidence should be recorded in Onsite as the Issue Date
| |
Welder Certificate AS 1796-2001 - No 3 Anchor |
---|
| weldercertasno3 |
---|
| weldercertasno3 |
---|
|
| - Applicants name must be displayed on evidence and this must match the applicants registered name in Onsite
- A certificate or card can be accepted
- Must show completion of Manual metal-arc welding (MMAW) of welds in carbon steel pipe (single vee weld from one side only).
- If card is uploaded, both sides of card should be displayed in uploaded file
- Evidence must be issued by a registered training organisation (RTO)
- There must be an indication of the number that the applicant was certified in
- Black and white or colour copy can be accepted
| - Date of completion shown on the evidence should be recorded in Onsite as the Issue Date
| |
Welder Certificate AS 1796-2001 - No 3E | - Applicants name must be displayed on evidence and this must match the applicants registered name in Onsite
- A certificate or card can be accepted
- Must show completion of Manual metal-arc welding (MMAW) of welds using hydrogen controlled electrodes in alloy steel plate and alloy steel pipe over 270 mm outside diameter (single vee weld from one side only)
- If card is uploaded, both sides of card should be displayed in uploaded file
- Evidence must be issued by a registered training organisation (RTO)
- There must be an indication of the number that the applicant was certified in
- Black and white or colour copy can be accepted
| - Date of completion shown on the evidence should be recorded in Onsite as the Issue Date
| |
Welder Certificate AS 1796-2001 - No 4 Anchor |
---|
| weldercertasno4 |
---|
| weldercertasno4 |
---|
|
| - Applicants name must be displayed on evidence and this must match the applicants registered name in Onsite
- A certificate or card can be accepted
- Must show completion of Manual metal-arc welding (MMAW) of weld using hydrogen-controlled electrodes in alloy steel pipe (single vee welded from one side only)
- If card is uploaded, both sides of card should be displayed in uploaded file
- Evidence must be issued by a registered training organisation (RTO)
- There must be an indication of the number that the applicant was certified in
- Black and white or colour copy can be accepted
| - Date of completion shown on the evidence should be recorded in Onsite as the Issue Date
| |
Welder Certificate AS 1796-2001 - No 5 Anchor |
---|
| weldercertasno5 |
---|
| weldercertasno5 |
---|
|
| - Applicants name must be displayed on evidence and this must match the applicants registered name in Onsite
- A certificate or card can be accepted
- Must show completion of Gas tungsten-arc welding (GTAW) root run and manual metal-arc welding (MMAW) of welds using hydrogen-controlled electrodes in alloy steel pipe (single vee welded from one side only)
- If card is uploaded, both sides of card should be displayed in uploaded file
- Evidence must be issued by a registered training organisation (RTO)
- There must be an indication of the number that the applicant was certified in
- Black and white or colour copy can be accepted
| - Date of completion shown on the evidence should be recorded in Onsite as the Issue Date
| |
Welder Certificate AS 1796-2001 - No 6 Anchor |
---|
| weldercertasno6 |
---|
| weldercertasno6 |
---|
|
| - Applicants name must be displayed on evidence and this must match the applicants registered name in Onsite
- A certificate or card can be accepted
- Must show completion of Gas welding (GW) (single vee welded from one side only)
- If card is uploaded, both sides of card should be displayed in uploaded file
- Evidence must be issued by a registered training organisation (RTO)
- There must be an indication of the number that the applicant was certified in
- Black and white or colour copy can be accepted
| - Date of completion shown on the evidence should be recorded in Onsite as the Issue Date
| |
Welder Certificate AS 1796-2001 - No 7 Anchor |
---|
| weldercertasno7 |
---|
| weldercertasno7 |
---|
|
| - Applicants name must be displayed on evidence and this must match the applicants registered name in Onsite
- A certificate or card can be accepted
- Must show completion of Gas tungsten-arc welding (GTAW) (single vee welded from one side only)
- If card is uploaded, both sides of card should be displayed in uploaded file
- Evidence must be issued by a registered training organisation (RTO)
- There must be an indication of the number that the applicant was certified in
- Black and white or colour copy can be accepted
| - Date of completion shown on the evidence should be recorded in Onsite as the Issue Date
|
|
Welder Certificate AS 1796-2001 - No 8F | - Applicants name must be displayed on evidence and this must match the applicants registered name in Onsite
- A certificate or card can be accepted
- Must show completion of Flux cored arc welding (FCAW) of plate and pipe
- If card is uploaded, both sides of card should be displayed in uploaded file
- Evidence must be issued by a registered training organisation (RTO)
- There must be an indication of the number that the applicant was certified in
- Black and white or colour copy can be accepted
| - Date of completion shown on the evidence should be recorded in Onsite as the Issue Date
| |
Welder.Certificate. AS 1796-2001 - No 8G Anchor |
---|
| weldercertasno8g |
---|
| weldercertasno8g |
---|
|
| - Applicants name must be displayed on evidence and this must match the applicants registered name in Onsite
- A certificate or card can be accepted
- Must show completion of Gas metal-arc welding (GMAW) of plate and pipe
- If card is uploaded, both sides of card should be displayed in uploaded file
- Evidence must be issued by a registered training organisation (RTO)
- There must be an indication of the number that the applicant was certified in
- Black and white or colour copy can be accepted
| - Date of completion shown on the evidence should be recorded in Onsite as the Issue Date
| |
Welder.Certificate. AS 1796-2001 - No 9 Anchor |
---|
| weldercertasno9 |
---|
| weldercertasno9 |
---|
|
| - Applicants name must be displayed on evidence and this must match the applicants registered name in Onsite
- A certificate or card can be accepted
- Must show completion of Automatic Welding
- If card is uploaded, both sides of card should be displayed in uploaded file
- Evidence must be issued by a registered training organisation (RTO)
- There must be an indication of the number that the applicant was certified in
- Black and white or colour copy can be accepted
| - Date of completion shown on the evidence should be recorded in Onsite as the Issue Date
| |
Welder Certificate AS 1796-2001 - No 10 | - Applicants name must be displayed on evidence and this must match the applicants registered name in Onsite
- A certificate or card can be accepted
- Must show completion of Welding Supervisor
- If card is uploaded, both sides of card should be displayed in uploaded file
- Evidence must be issued by a registered training organisation (RTO)
- There must be an indication of the number that the applicant was certified in
- Black and white or colour copy can be accepted
| - Date of completion shown on the evidence should be recorded in Onsite as the Issue Date
| |