titleAppointment and Nomination Forms

Anchor
whcappointmentforms
whcappointmentforms

CertificationCertification RequirementsUpload RequirementsExamples

Whitehaven Coal Contract Contractor Owner Appointment Form (WHC-FRM-Contractor Owner)


This business rule was last updated by WHC on 26.02.2019

01/03/2021

  • Name of Appointee: Contract Contractor Owner as listed on FORM 1 and Form 2Contracting companyWHC-FRM-Contractor Engagement
  • Name of Contracting Company: Must be listed and match company registered in system

P/L / Pty LTD / Pty Limited can be accepted in any of these forms if also listed as the name in the system

Aust / Australia can be accepted in any of these forms if also listed as the name in the system

Ttee (means trust) this is acceptable as long as the rest of the name matches

  • onsite
  • This appointment applies at the following WHC Site(s) / Department(s): Sites Site(s) must be listedticked
  • WHC Contract Contractor Owner:must complete name, signature and date. Name must match FORM 1.
  • Appointed By:must complete name, signature and date. Name must match FORM 1 -  Sign off must be completed by a Mine Operator or Delegate (Mine Site) or Relevant Manager (Off Site) .
  • Black and white or colour copy is accepted
  • Contract Owner is not needed for class A
  • Black and white or colour copy is acceptedassociated with the relevant site/s ticked as per the Approved Authorisers list

The latest version of

the Whitehaven Coal Contract Owner Appointment Form

this form is issue

1

2.0 –

only latest

version

acceptedIf form 1 is stating several contract coordinators, all forms for contract coordinators should be uploaded in the portal

1.0 may also be accepted until 31.03.2021

  • Issue date to be recorded as Date of document approval by WHCExpiration date as per Whitehaven Coal Contractor Engagement Form 1 - valid for 3 years
  • Expiry date must align with the Primary Contracting Company’s WHC-FRM-Engagement form expiry

Pegasus staff click here for additional business rule information prior to completing file verification

Whitehaven Coal Contract Contractor Coordinator Appointment Form (WHC-FRM-Contractor Coordinator)


This business rule was last updated by WHC on 26.02.2019 01/03/2021

  • Name of Appointee: Contract Coordinator as listed FORM 2 and FORM 1Must be a WHC employee
  • Name of Contracting Company:must be listed and match registered company in system

P/L / Pty LTD / Pty Limited can be accepted in any of these forms if also listed as the name in the system

Aust / Australia can be accepted in any of these forms if also listed as the name in the system

Ttee (means trust) this is acceptable as long as the rest of the name matches

  • Onsite
  • This appointment applies at the following WHC Site(s)/Department(s): Sites Site(s) must be listedticked
  • WHC Contract Coordinator: must complete name, signature and date. Name must match FORM 1.
  • Appointed By: must complete name, signature and date. Name must match FORM 1 - Mine Operator or Delegate (Mine Site) or Relevant Manager (Off Site).Black and white or colour copy is accepted WHC Contractor Owner must match the contracting company’s WHC-FRM-Contractor Engagement


The latest version of the Whitehaven Coal Contract Coordinator Appointment Form this form is issue 45.0 – only latest previous version may also be accepted
  • If form 1 is stating several contract coordinators, all forms for contract coordinators should be uploaded in the portal
  • until 31.03.2021
    • Issue date to be recorded as Date of document approval by WHCExpiration date as per Whitehaven Coal Contractor Engagement Form 1 - valid for 3 years
    • Expiry date must align with the Primary Contracting Company’s WHC-FRM-Engagement form expiry

    Pegasus staff click here for additional business rule information prior to completing file verification

    Anchor
    contractorcompanysupervisornom
    contractorcompanysupervisornom
    Contractor Company Supervisor Nomination Form


    This business rule was last updated by WHC on 02.04.2019

    • Details:

                  Contractor company: must be displayed on form and must match registered company details in system.

    P/L / Pty LTD / Pty Limited can be accepted in any of these forms if also listed as the name in the system

    Aust / Australia can be accepted in any of these forms if also listed as the name in the system

    Ttee (means trust) this is acceptable as long as the rest of the name matches

                  Contractor company supervisor: must be listed and match Form 1 and Form 2.

    • Site/Area:  must be listed as per site required - Click HERE for a list of sites;
    • WHC Contractor Owner (class B & C): must be listed;
    • WHC Contract Coordinator(s): must be listed –  at least one contract coordinator per site, the contract owner might or might not be the same for all sites listed
    • Approval (Site or Area): must have name printed, must be signed and dated. Name must match FORM 1 - Mine Operator or Delegate(Mine Site) or Relevant Manager (Off Site): Note; Version 2 - If the contract owner has signed in place of the Mine Operator or Delegate or Relevant Manager, this can be accepted.
    • Black and white or colour copy is accepted


    The latest version of the Contractor Company Supervisor Nomination Form is issue 3.0 – version 2 and 3 can be accepted.

    Version 2 accepted until the 30.09.2019

    • Issue date to be recorded as Date of document signature by contracting company
    • Expiration date as per Whitehaven Coal Contractor Engagement Form 1 - valid for 3 years

    Pegasus staff click here for additional business rule information prior to completing file verification



    Expand
    titleContractor Details


    CertificationCertification RequirementsUpload RequirementsExamples

    Head Contractor Details

    • Contracting company details must be displayed on form
    • Contracting company details must match registered company details in system

    P/L / Pty LTD / Pty Limited can be accepted in any of these forms if also listed as the name in the system

    Aust / Australia can be accepted in any of these forms if also listed as the name in the system

    Ttee (means trust) this is acceptable as long as the rest of the name matches

    • Head contractor Company details to be displayed
    • Black and white or colour copy is accepted
    • Issue date to be recorded as the date of submission
    • Expiry date to be calculated as 6 months from Issue date

    Anchor
    subcontractorform
    subcontractorform
    Subcontractor Details

    • Contracting company details must be displayed on form
    • Contracting company details must match registered company details in system

    P/L / Pty LTD / Pty Limited can be accepted in any of these forms if also listed as the name in the system

    Aust / Australia can be accepted in any of these forms if also listed as the name in the system

    Ttee (means trust) this is acceptable as long as the rest of the name matches

    • Subcontractor Company details to be displayed
    • Black and white or colour copy is accepted
    • Issue date to be recorded as the date of submission
    • Expiry date to be calculated as 6 months from Issue date



    Expand
    titleContractor Engagement


    CertificationCertification RequirementsUpload RequirementsExamples

    Anchor
    contractorengagementform1
    contractorengagementform1
    Whitehaven Coal Contractor Engagement Form 1


    This business rule was last updated by WHC on 26.02.2019


    • Details:

    Contractor company: must be displayed on form and must match registered company details in system.

    P/L / Pty LTD / Pty Limited can be accepted in any of these forms if also listed as the name in the system

    Aust / Australia can be accepted in any of these forms if also listed as the name in the system

    Ttee (means trust) this is acceptable as long as the rest of the name matches

    Contractor company supervisor: must be listed

    • Site/Area:  must be listed as per site required - Click HERE for a list of sites;

    WHC Contractor Owner (class B & C): must be listed;

                   WHC Contract Coordinator(s): names must be listed – at least one contract coordinator per site, the contract owner might or might not be the same for all sites listed

    • Scope of Work: must be listed
    • Contractor Classification & Justification: must be ticked and must match class selected in system.
    • Contractor management section all questions completed
    • Approval (Site or Area): must have name printed, must be signed and dated. Must be completed in accordance to the site listed in the field – Site/Area on this form. 
      List of authorised approvers can be found HERE
    • Black and white or colour copy is accepted


    The latest version of the Form 1 document is issue 5.0 - only latest version accepted
    • Issue date to be recorded as Date of document approval by WHC
    • Expiration to be recorded 3 years from starting date except if stated otherwise in the document.

    Anchor
    subcontractorengagementform5
    subcontractorengagementform5
    WHC-FRM-SUB-CONTRACTOR ENGAGEMENT –Form 5


    This business rule was last updated by WHC on 02.04.2020


    Primary Contractor company: Must have a primary contracting company listed who is already registered with Whitehaven Coal.

    P/L / Pty LTD / Pty Limited can be accepted in any of these forms if also listed as the name in the system

    Aust / Australia can be accepted in any of these forms if also listed as the name in the system

    Ttee (means trust) this is acceptable as long as the rest of the name matches

    Sub-contractor Company: Must be listed.

    Site/Area:  must be listed as per site required - Click HERE for a list of sites.

    WHC Contractor Owner (class B & C): must be listed;

    WHC Contract Coordinator(s): must be listed –  at least one contract coordinator per site, the contract owner might or might not be the same for all sites listed

    Scope of Work: must be listed.

    Approval (site or area): A minimum of one WHC contract owner must be listed and must match primary contracting company Form 1.

    Acknowledgement:Primary contractor company supervisor name must match Form 1.

    Version 4.0 released 06/04/2018, previous versions accepted for 3 months past this release date.

    • Form(s) can be uploaded separately or as a bundle.
    • 1 form per sub-contractor
    • Expiration date as per Whitehaven Coal ContractorEngagement Form 1 – valid for 3 years

    Pegasus staff click here for additional business rule information prior to completing file verification



    Expand
    titleHSE Documentation

    Anchor
    hsedocumentation
    hsedocumentation

    CertificationCertification RequirementsUpload RequirementsExamples

    Whitehaven Coal HSE Document Form 2


    This business rule was last updated by WHC on 26.02.2019


    • Details:

    Contractor company: must be displayed on form and must match registered company details in system.

    P/L / Pty LTD / Pty Limited can be accepted in any of these forms if also listed as the name in the system

    Aust / Australia can be accepted in any of these forms if also listed as the name in the system

    Ttee (means trust) this is acceptable as long as the rest of the name matches


    Contractor company supervisor: must be listed and match Form 1

    • Site/Area:  must be listed as per site required - Click HERE for a list of sites;

    WHC Contractor Owner (class B & C): must be listed;
    WHC Contract Coordinator(s): must be listed –at least one contract coordinator per site, the contract owner   might or might not be the same for all sites listed

    • Contracting Company Acknowledgement: Contractor Company to complete either class B or C section.
    • Contractor Company Supervisor: must print name, sign and date. Details must match Form 1.
    • Black and white or colour copy is accepted


    The latest version of the Form 2 document is issue 7.0 – only latest version accepted
    • Form 2 only required for Class B and C
    • Issue date to be recorded as Date of document approval by WHC
    • Expiration date as per Whitehaven Coal Contractor Engagement Form 1 – valid for 3 years

    Pegasus staff click here for additional business rule information prior to completing file verification









    Business Rule for Version 7.0 of the Whitehaven Coal HSE Document Form 2:

    • Contract owners and coordinators to be listed for each site,
    • Contract owner to approve form
    • And contracting company to acknowledge their classification and sign form.

    Business Rule for Version 7.0 of the Whitehaven Coal HSE Document Form 2:

    • Issue date to be recorded as Date of document approval by WHC
    • Expiration date as per Whitehaven Coal Contractor Engagement Form 1 – valid for 3 years