Safety.Induction.Open Cut and Generic ATUI Form | Click HERE to access a copy of the form Click HERE to access the authorised approvers list All 6 pages of the form must be uploaded Page 1 - Name of inductee must match registering person
- Position must be completed
- Contractor Company must be completed
- WHC Contract Owner or Coordinator email – NOT MANDATORY
- Must select Primary WHC site and all sections must be completed.
- Induction(s) required – must be completed
- Approval section:
The contract owner or coordinator needs to be listed, they must sign and date. The mechanical or electrical is only required if the role is linked to any mechanical or electrical role. - The Manager of Mining engineering (MME) needs to sign for the role 'All Open Cut - Operator'.
NOTE: Gunnedah CHPP does not have a MME – therefore this signature is not required for applicants that have indicated Gunnedah CHPP as their primary WHC site even if the 'All Open Cut - Operator' role has been chosen. Page 2 - Inductions; Check list must be completed
Page 3 - Roles; A role in the Open Cut section must be selected
Page 4, 5 & 6 Only version 10 11 & 11 12 will be accepted. Version 10 11 accepted until 31st March 30th April 2019 | |
|
Safety.Induction.Underground and Generic ATUI Form | Click HERE to access a copy of the form Click HERE to access the authorised approvers list All 6 pages of the form must be uploaded Page 1 - Name of inductee must match registering person
- Position must be completed
- Contractor Company must be completed
- WHC Contract Owner or Coordinator email – NOT MANDATORY
- Must select Primary WHC site and all sections must be completed.
- Induction(s) required – must be completed
- Approval section:
The contract owner or coordinator needs to be listed, they must sign and date. The mechanical or electrical is only required if the role is linked to any mechanical or electrical role. The Manager of Mining engineering (MME) needs to sign for ALL underground trades and Operator for Narrabri.
NOTE: MME sign off not needed for surface role at Narrabri Page 2 - Inductions; Check list must be completed
Page 3 - Roles; A role in the Underground section must be selected
Page 4, 5 & 6 Only version 10 11 & 11 12 will be accepted. Version 10 11 accepted until 31st March 30th April 2019 | | |