Whitehaven Coal Contract Owner Appointment Form


This business rule was last updated by WHC on 26.02.2019

  • Name of Appointee: Contract Coordinator Owner as listed on FORM 1 and Form 2 and FORM 1
  • Name of Contracting Companycompany: must Must be listed and match company registered company in Onsiteonsite
  • This appointment applies at the following WHC Site(s) / Department(s): Sites must be listed
  • WHC Contract CoordinatorOwner: must complete name, signature and date. Name must match FORM 1.
  • Appointed By: must complete name, signature and date. Name must match FORM 1 - Mine Operator or Delegate (Mine Site) or Relevant Manager (Off Site).
  • Black and white or colour copy is accepted
  • Contract Owner is not needed for class A
  • Black and white or colour copy is accepted

 

The latest version of the Whitehaven Coal Contract Coordinator Owner Appointment Form is issue 41.0 – only latest version accepted
  • If form 1 is stating several contract coordinators, all forms for contract coordinators should be uploaded in the portal
  • Issue date to be recorded as Date of document approval by WHC
  • Expiration date as per Whitehaven Coal Contractor Engagement Form 1 - valid for 3 years

Whitehaven Coal Contract Coordinator Appointment Form


This business rule was last updated by WHC on 26.02.2019

  • Name of Appointee: Contract Coordinator as listed FORM 2 and FORM 1
  • Name of Contracting Company: must be listed and match registered company in Onsite
  • This appointment applies at the following WHC Site(s)/Department(s): Sites must be listed
  • WHC Contract Coordinator: must complete name, signature and date. Name must match FORM 1.
  • Appointed By: must complete name, signature and date. Name must match FORM 1 - Mine Operator or Delegate (Mine Site) or Relevant Manager (Off Site).
  • Black and white or colour copy is accepted

 

The latest version of the Whitehaven Coal Contract Coordinator Appointment Form is issue 4.0 – only latest version accepted
  • If form 1 is stating several contract coordinators, all forms for contract coordinators should be uploaded in the portal
  • Issue date to be recorded as Date of document approval by WHC
  • Expiration date as per Whitehaven Coal Contractor Engagement Form 1 - valid for 3 years

Contractor Company Supervisor Nomination Form


This business rule was last updated by WHC on 27.02.2019

  • Details:

              Contractor company: must be displayed on form and must match registered company details in Onsite.

              Contractor company supervisor: must be listed and match Form 1 and Form 2.

  • Site/Area:  must be listed as per site required;
  • WHC Contractor Owner (class B & C): must be listed;
  • WHC Contract Coordinator(s): must be listed –  at least one contract coordinator per site, the contract owner might or might not be the same for all sites listed
  • Approval (Site or Area): must have name printed, must be signed and dated. Name must match FORM 1 - Mine Operator or Delegate(Mine Site) or Relevant Manager (Off Site):
  • Black and white or colour copy is accepted

 

The latest version of the Contractor Company Supervisor Nomination Form is issue 2.0 – only latest version accepted
  • Issue date to be recorded as Date of document signature by contracting company
  • Expiration date as per Whitehaven Coal Contractor Engagement Form 1 - valid for 3 years

Whitehaven Coal Authority to Undertake Induction
  • Contracting company details must be displayed on form
  • Contracting company details must match registered company details in Onsite
  • Authority to Undertake Induction form to be completed and uploaded
  • Black and white or colour copy is accepted

NOTE: All people intending to work underground need Gerald Linde or Brian Williams to sign off on the ATUI (form 3) and Form 2

  • MEM - all mechanical trades (Surface and UG) (Richard Hokin)
  • EEM  - all electrical trades (Surface and UG) (Chris Bentham)
  • CHPP, Surface  Civil and Engineering - (Aron Cane)
  • Surface Drilling, Enviro, cultural Heritage and Tech Services - (Owen Salisbury or Dave Ellwood )
  • Safety and Training - (Scott Ginnivan)

Example:

If U/G mechanical trade then Gerald or Brian AND Richard Hokin to sign.

If enviro work then only Owen or Dave to sign

  •  Issue date to be recorded as the date of document approval by WHC
 
Expand
titleContractor Details
CertificationCertification RequirementsUpload RequirementsExamples

Head Contractor Details

  • Contracting company details must be displayed on form
  • Contracting company details must match registered company details in Onsite
  • Head contractor Company details to be displayed
  • Black and white or colour copy is accepted
  • Issue date to be recorded as the date of submission
  • Expiry date to be calculated as 6 months from Issue date
 

Anchor
subcontractorform
subcontractorform
Subcontractor Details

  • Contracting company details must be displayed on form
  • Contracting company details must match registered company details in Onsite
  • Subcontractor Company details to be displayed
  • Black and white or colour copy is accepted
  • Issue date to be recorded as the date of submission
  • Expiry date to be calculated as 6 months from Issue date
 
Expand
titleContractor Engagement
CertificationCertification RequirementsUpload RequirementsExamples

Anchor
contractorengagementform1
contractorengagementform1
Whitehaven Coal Contractor Engagement Form 1


This business rule was last updated by WHC on 16.05.2018


  • Details:Contracting

Contractor company

details

: must be displayed on form

Contracting company details

and must match registered company details in Onsite.

Contractor company supervisor

box

: must be

completed

listed

  • Site/Area – must :  must be listed as per site required;

WHC Contractor Owner (class B & C)

: must be listed;

WHC

               WHC Contract Coordinator(s)

: must be listed –

One

at least one contract coordinator per site, the contract owner might or might not be the same for all sites listed

  • Scope of Work section : must be listed
  • Contractor Classification & Justification: must be ticked and must match class selected in Onsite.
  • Contractor management section all questions completed
  • Notifications to relevant WHC department - optional
  • Approval – Approval (Site or Area): must have name printed, must be signed and dated. Must be completed in accordance to the site listed in the field – Site/Area on this form. 
    List of authorised approvers can be found HERE
  • Whitehaven Coal Contractor Engagement Form 1 to be completed and uploadedBlack and white or colour copy is accepted

 

The latest version of the Form 1 document is issue 5.0 Black and white or colour copy is - only latest version accepted
  • Issue date to be recorded as Date of document approval by WHC
  • Expiration to be recorded 3 years from starting date except if stated otherwise in the document.

WHC-FRM-SUB-CONTRACTOR ENGAGEMENT –Form 5


This business rule was last updated by WHC on 26.02.2019


  • Details:

Primary Contractor company: Must match contracting company on FORM 1 and must match registered company in onsite.

IMPORTANT; If the primary company listed on the WHC-FRM-SUB-CONTRACTOR ENGAGEMENT –Form 5,  is the registering company which you are now processing, refer to their Form 1 and 2. If they do not have a Form 1, they have registered incorrectly. Do not proceed.  

If the Sub-contractor company listed on the WHC-FRM-SUB-CONTRACTOR ENGAGEMENT –Form 5, is the registering company which you are now processing, Pegasus staff will need to look up the primary contractor’s profile in Onsite, click on their compliance tab and refer to their Form 1 and 2. If the primary contractor has not registered yet and there is no form 1 or 2 to refer to, please ensure that the owner recorded on this form for each site, is the same person signing off approval for each site.

Sub-contractor Company: details must be displayed on form.

  • Site/Area:  must be listed as per site required;
  • WHC Contractor Owner (class B & C): must be listed;
  • WHC Contract Coordinator(s): must be listed –  at least one contract coordinator per site, the contract owner might or might not be the same for all sites listed
  • Scope of Work: must be listed
  • Sub-contractor Management: all questions completed.
  • Approval (site or area): WHC contract owner must match FROM 2. Must have name, signature and date.
  • Acknowledgement: Primary contractor company supervisor name must match FORM 1, must be signed and dated.
  • Black and white or colour copy is accepted

 

The latest version of the Form 5 document is issue 4.0 – only latest version accepted
  • Form(s) can be uploaded separately or as a bundle.
  • 1 form per sub-contractor
  • Expiration date as per Whitehaven Coal ContractorEngagement Form 1 – valid for 3 years
Expand
titleHSE Documentation

Anchor
hsedocumentation
hsedocumentation

Contracting company details Business Rule for Version 6.0 of the Whitehaven Coal HSE Document Form 2:
CertificationCertification RequirementsUpload RequirementsExamples

Whitehaven Coal HSE Document Form 2


This business rule was last updated by WHC on 2426.0402.2018

2019


  • Details:

Contractor company: must be displayed on form

Contracting company details

and must match registered company details in Onsite.
Contractor

Company Supervisor – listed

company supervisor: must be listed and match Form 1

  • Site/Area:  must be listed as per site required;

WHC

Contract

Contractor Owner (class B & C)

; WHC contract Coordinator – must match details listed on FORM 1
  • WHC Group Standards – OC and/or Narrabri mine section completed. 
  • Other relevant WHC standards or procedures – optional
  • WHC (OC) and/or WHC (NCO) Approvals – must match FORM 1. Must have name printed, signed and dated. 1 Mine operator minimum or relevant manager must sign for his area for OC, U/G need 3 signatures for MME, electrical and mechanical Engineering
    List of authorised approvers can be found HERE
  • Contractor Company Acknowledgement must be completed – the Class must match FORM 1, name needs to be inserted in statement.
  • The class must be selected, to confirm that they agree to classification given
  • Contractor company supervisor – Must have name printed, signature and dated.
  • Approval – Must have name printed, signature and dated.
  • Whitehaven Coal H&C Document Form 2 to be completed and uploaded

    : must be listed;
    WHC Contract Coordinator(s): must be listed –at least one contract coordinator per site, the contract owner   might or might not be the same for all sites listed

    • Contracting Company Acknowledgement: Contractor Company to complete either class B or C section.
    • Contractor Company Supervisor: must print name, sign and date. Details must match Form 1.
    • Black and white or colour copy is accepted

     

    NOTE: All people intending to work underground need Gerald Linde or Brian Williams to sign off on the ATUI (form 3) and Form 2

    • MEM - all mechanical trades (Surface and UG) (Richard Hokin)
    • EEM  - all electrical trades (Surface and UG) (Chris Bentham)
    • CHPP, Surface  Civil and Engineering - (Aron Cane)
    • Surface Drilling, Enviro, cultural Heritage and Tech Services - (Owen Salisbury or Dave Ellwood )
    • Safety and Training - (Scott Ginnivan)

    Example:

    If U/G mechanical trade then Gerald or Brian AND Richard Hokin to sign.

    If enviro work then only Owen or Dave to sign

    Business Rule for Version 6.0 of the Whitehaven Coal HSE Document Form 2:

    NOTE: This version of the document is only going to be acceptable until 31/12/2018 - From this date, only Version 7.0 will be acceptableThe latest version of the Form 2 document is issue 7.0 – only latest version accepted
    • Form 2 only required for Class B and C
    • Issue date to be recorded as Date of document approval by WHC
    • Expiration date as per Whitehaven Coal Contractor Engagement Form 1 – valid for 3 years

     

     

     

     



     

    Business Rule for Version 7.0 of the Whitehaven Coal HSE Document Form 2:

    • Contract owners and coordinators to be listed for each site,
    • Contract owner to approve form
    • And contracting company to acknowledge their classification and sign form.

    Business Rule for Version 7.0 of the Whitehaven Coal HSE Document Form 2:

    • Issue date to be recorded as Date of document approval by WHC
    • Expiration date as per Whitehaven Coal Contractor Engagement Form 1 – valid for 3 years