Document | Document Requirements | Upload Requirements | Examples |
---|---|---|---|
|
- Evidence must be uploaded for Articulated Dump Trucks only
- Evidence must show verification of Inclinometer integrated with tipping function.
|
| Issue/inspection Date = Record this as it is listed on the |
recertification Expiry Date = recertification date + 10 years | |||||||||
|
| Issue/inspection Date = Record this as it is listed on the recertification Expiry Date = recertification date + 6 years | |||||||
Access equipment – electrical/RCD
|
| Issue/inspection Date = Record this as it is listed on the |
certificate Expiry Date = Record this as issue date + 3 months. | |
Access equipment - MEWP inspection | For all MEWP both < and > 11 metres:
|
|
For MEWP > 11 metres:
| Issue/inspection Date = Record this as it is listed on the certificate Expiry Date = Record this as issue date + |
12 months. | |||||||||
|
| Issue/inspection Date = Record this as it is listed on the uploaded evidence | |||||||
|
| Issue/inspection Date = Record this as it is listed on the certificate Expiry Date = Record this as it is listed on the certificate |
- Professional engineer
- NDT technician
- Qualified tradesman
|
| Issue/inspection Date = Record this as it is listed in the logbook Expiry Date = Record this as issue date + 1 month. | |||||||
|
| Issue/inspection Date = Record this as it is listed on the |
For all MEWP both < and > 11 metres:
- Report to be on company letterhead
- Company completing report to provide details including:
- ABN
- Contact including address and phone
- Report to be current – ie date on report within 12 months of current date
For MEWP > 11 metres:
Access equipment – electrical/RCD
uploaded evidence | |||||||||
|
| Issue/inspection Date = Record this as it is listed on the uploaded evidence | |||||||
| NOTE: Lifting Equipment Register to be available with Plant Item performing lifting tasks.
| Issue/inspection Date = Record this as it is listed on the certificate Expiry Date = Record this as issue date + 12 months. |
- Evidence supplied must be Lifting Equipment Register
- Date of installation to be indicated on evidence
Lighting Plants - electrical |
| Issue/inspection Date = Record this as it is listed on the certificate |
|
|
|
Piling Rigs – crack testing report
|
|
|
Piling Rigs – lifting equipment register |
|
|
|
/ Annual Inspection |
|
| |||||
|
|
|
|
|
|
|
Truck Mounted EWP- HV Insulated 6 Month Electrical Test |
| Issue/inspection Date = Record this as it is listed |
on the |
certificate Expiry Date = Record this as issue date + |
6 months. |
Vehicle Mounted Cranes and Crane Trucks – annual recertification |
| Issue/inspection Date = Record this as it is listed on the certificate Expiry Date = Record this as it is listed on the certificate |
Vehicle Mounted Cranes and Crane Trucks – crane log book |
| Issue/inspection Date = Record this as it is listed in the log book Expiry Date = Record this as issue date + 12 months. |