  • Document must be fully completed and signed in all signature blocks
  • Contracting company details must be displayed on form
  • Contracting company details must match registered company details in Onsite
  • Black and white or colour copy is accepted
    Expand
    titleAppointment and Nomination Forms

    Anchor
    whcappointmentforms
    whcappointmentforms

    CertificationCertification RequirementsUpload RequirementsExamples

    Whitehaven Coal

    Contract

    Contractor Owner Appointment Form

  • Document must be fully completed and signed by all required WHC personnel in all signature blocks
  • Contracting company details must be displayed on form
  • Contracting company details must match registered company details in Onsite
  • Black and white or colour copy is accepted

    Contractor Company Supervisor Nomination Form

    (WHC-FRM-Contractor Owner)


    • Name of Appointee: Contractor Owner as listed on WHC-FRM-Contractor Engagement
    • Name of Contracting Company: Must be listed and match company registered in the system
    • This appointment applies at the following WHC Site(s) / Department(s): Site(s) must be ticked
    • WHC Contractor Owner:must complete name, signature and date.
    • Appointed By: Sign off must be completed by a Mine Operator or Delegate (Mine Site) or Relevant Manager (Off Site) associated with the relevant site/s ticked as per the Approved Authorisers list

    The latest version of this form is issue 4.0. The next previous version can also be accepted.

    • Issue date to be recorded as Date of document approval by WHC
  • Expiration date as per Whitehaven Coal Contractor Engagement Form 1
  •  

    Whitehaven Coal Contract Coordinator Appointment Form

    • Document must be fully completed and signed by all required WHC personnel in all signature blocks
    • Contracting company details must be displayed on form
    • Contracting company details must match registered company details in Onsite
    • Black and white or colour copy is accepted
    • Issue date to be recorded as Date of document approval by WHC
    • Expiration date as per Whitehaven Coal Contractor Engagement Form 1

     

    • Expiry date must align with the Primary Contracting Company’s WHC-FRM-Contractor Engagement – [SITE] form expiry

    Pegasus staff click here for additional business rule information prior to completing file verification


    Whitehaven Coal Contractor Coordinator Appointment Form (WHC-FRM-Contractor Coordinator)



    • Name of Appointee:Must be a WHC employee
    • Name of Contracting Company:must be listed and match registered company in the system
    • This appointment applies at the following WHC Site(s)/Department(s):Site(s) must be ticked
    • WHC Contract Coordinator: must complete name, signature and date.
    • Appointed By: WHC Contractor Owner must match the contracting company’s WHC-FRM-Contractor Engagement


    The latest version of this form is issue 8.0. The next previous version can also be accepted.
    • Issue date to be recorded as Date of document
    signature
    • approval by
    contracting company 
    • WHC
  • Expiration date as per Whitehaven Coal Contractor Engagement Form 1
    • Expiry date must align with the Primary Contracting Company’s WHC-FRM-Contractor Engagement – [SITE] form expiry

    Pegasus staff click here for additional business rule information prior to completing file verification




    Black and white or colour copy is accepted

    Whitehaven Coal Sub-contractor Engagement Form 5 (Subcontractor engaged by a primary contractor)

  • Forms are uploaded but not against a cert – need to be transferred to non-verified cert
  • Document must be fully completed and signed in all signature blocks by Contract owner, Contract coordinator and nominated contractor company supervisor. Names of people required to sign can be identified in the appropriate forms that must also be uploaded (see below)
    Expand
    titleContractor Engagement


    CertificationCertification RequirementsUpload RequirementsExamples

    Anchor
    contractorengagementform1
    contractorengagementform1

    Whitehaven Coal

    WHC-FRM-Contractor Engagement

    Form 1

    – [SITE]




    • Contracting
    company details
    • Company: must be
    displayed on formContracting company details must
    • listed and match registered company
    details
    • in
    Onsite
  • Black and white or colour copy is accepted
    • Issue date to be recorded as Date of document approval by WHC
    • Expiration to be recorded as Issue date plus duration of project (can be found in the responses to the questionnaire)
    Image Removed
    Anchor
    SubContractorEngagementForm5SubContractorEngagementForm5
    • Contracting company details must be displayed on form
    • Contracting company details must match registered company details in Onsite
    • Black and white or colour copy is accepted
    • Document must be fully completed and signed in all signature blocks by Contract owner, Contract coordinator and nominated contractor company supervisor. Names of people required to sign can be identified in the appropriate forms that must also be uploaded (see below)
    • Issue date to be recorded as Date of document approval by WHC
    • Expiration date as per Whitehaven Coal Contractor Engagement Form 1
    Image Removed

    Whitehaven Coal Sub-contractor Engagement Form 5 (Uploaded by primary contractor for subcontractors they engage)

    • the system
    • Contractor Representative Name: must be listed (not applicable for Class A)
    • WHC Contractor Owner Name: must be listed
    • Site(s): must be ticked. Click HERE for a list of sites;
    • Scope of work: must be completed
    • Classification Result: must be indicated and responses to questions circled
    • Sub-contractors: must be completed
    • WHC HSE Document Review Acknowledgement: if classification is B or C the appropriate box must be indicated (not required for Class A)
    • Contractor Representative (System Acknowledgement): must be completed
    • WHC Contractor Owner (System Approval): must be completed
    • Approvals to Engage Company for NEW FORM (Version 7.0 OR 8.0): A Mine Operator or Delegate (Mine Site) or Relevant Manager (Off Site) associated with each site indicated on page 1 must sign off. These approvers must be on the Approved Authorisers list.
    • List of authorised approvers per site can be found HERE

    The latest version of this form is issue 8.0. The next previous version can also be accepted. 

    • Issue date to be recorded as Date of document approval by WHC
  • Expiration date as per Whitehaven Coal Contractor Engagement Form 1
  •  
    Expand
    titleHSC Document
    Anchorhscdocumenthscdocument
    CertificationCertification RequirementsUpload RequirementsExamples
    Whitehaven Coal HSC Document Form 2
    • Document must be fully completed and signed by all required WHC personnel
    • If company has selected Narrabri as the site they are working at then all three signature bloclks must be signed. Contract owner / coordinator names can be identified in the appropriate forms that must also be uploaded (see below)
    • If the company has selected only Open Cut site(s) then only the Open Cut signature block needs to be completed.
    • Contracting company details must be displayed on form
    • Contracting company details must match registered company details in Onsite
    • Black and white or colour copy is accepted
    • Issue date to be recorded as Date of document approval by WHC
    • Expiration date as per Whitehaven Coal Contractor Engagement Form 1
     

     

     

    CertificationCertification RequirementsUpload RequirementsExamples

    Head Contractor Details

    • Contracting company details must be displayed on form
    • Contracting company details must match registered company details in Onsite
    • Head contractor Company details to be displayed
    • Black and white or colour copy is accepted
    • Issue date to be recorded as the date of submission
    • Expiry date to be calculated as 6 months from Issue date
      AnchorsubcontractorformsubcontractorformSubcontractor Details
    • Contracting company details must be displayed on form
    • Contracting company details must match registered company details in Onsite
    • Subcontractor Company details to be displayed
    • Black and white or colour copy is accepted
    • Issue date to be recorded as the date of submission
    • Expiry date to be calculated as 6 months from Issue date
      Anchorhandcdocform2handcdocform2Whitehaven Coal H&C Document Form 2
  • Contracting company details must be displayed on form
  • Contracting company details must match registered company details in Onsite
  • Whitehaven Coal H&C Document Form 2 to be completed and uploaded
  • Black and white or colour copy is accepted
    • Mine Operator or Delegate or Relevant Manager
    • Expiry date is 3 years from the date of approval

    Pegasus staff click here for additional business rule information prior to completing file verification

    Anchor
    subcontractorengagementform5
    subcontractorengagementform5
    WHC-FRM-Sub-contractor Engagement - [MAIN / FIRST / SECOND / THIRD / FOURTH / FIFTH /  SIXTH / SEVENTH] - [DIRECT / SUB] - [SITE NAME]



    IF submitted by a Primary Contracting Company:


    • Sub-contractor Company: must be listed and match a registered company in the system
    • Primary Contracting Company: must be listed and match registered company in the system
    • Primary Contractor Representative: must be listed
    • WHC Contractor Owner Name: must be listed
    • Site(s): must be ticked - Click HERE for a list of sites.
    • Scope of work: must be completed
    • Sub-contractor Management: must be completed
    • Primary Contractor Representative (Acknowledgement): must be completed
    • WHC Contractor Owner (Sub-contractor Approval): must be completed

    The next previous version of the current form can be accepted.


    IF submitted by a Subcontracting Company:

    • Sub-contractor Company: must be listed and match registered company in the system
    • Primary Contracting Company: must be listed and match a registered company in the system
    • Primary Contractor Representative: must be listed
    • WHC Contractor Owner Name: must be listed
    • Site(s): must be ticked - Click HERE for a list of sites.
    • Scope of work: must be completed
    • Sub-contractor Management: must be completed
    • Primary Contractor Representative (Acknowledgement): must be completed
    • WHC Contractor Owner (Sub-contractor Approval): must be completed

    The latest version of this form is issue 6.0. The next previous version of the current form can be accepted.

    • Issue date to be recorded as Date of document approval by WHC Contractor Owner
  • Expiration date as per Whitehaven Coal Contractor Engagement Form 1
  •   AnchorClassBContractorHSEPlanClassBContractorHSEPlanWhitehaven Coal Class B Contractor HSE Plan
  • Contracting company details must be displayed on form
  • Contracting company details must match registered company details in Onsite
  • Whitehaven Coal Class B Contractor HSE Plan to be completed and uploaded
    • Expiry date must align with the Primary Contracting Company’s WHC-FRM-Contractor Engagement – [SITE] form expiry

    Pegasus staff click here for additional business rule information prior to completing file verification



    Expand
    titleHSE Documentation

    Anchor
    hsedocumentation
    hsedocumentation

    WHC-FRM-Contractor HSEManagement Plan Review – (SITE NAME) 
    • Only required for Class C
    • Form is valid for 3 years
    • Contracting Company name much match the name of the company in the system
    • Form to be signed by WHC Contractor Owner, Department Manager and Mining Engineering Manager
    • Issue date to be recorded as
    Date
    • date of document approval by WHC Contractor Owner
    Expiration
    • Expiry date
    as per Whitehaven Coal Contractor Engagement Form 1
    • to be recorded as 3 years from issue date


    System.Contractor Management.
    WHC-FRM-Contractor HSE
    Documents Form 2
  • Contracting company details must be displayed on form
  • Contracting company details must match registered company details in Onsite
  • HSE Documents Form 2 to be completed and uploaded
  • Black and white or colour copy is accepted
    Management Plan Review – Biodiversity Offsets
    • Only required for Class C
    • Form is valid for 3 years
    • Contracting Company name much match the name of the company in the system
    • Form to be signed by WHC Contractor Owner, Department Manager and Mining Engineering Manager
    • Issue date to be recorded as
    Date
    • date of document approval by WHC
    Image RemovedWhitehaven Coal Authority to Undertake Induction
    • Contracting company details must be displayed on form
    • Contracting company details must match registered company details in Onsite
    • Authority to undertake Induction form to be completed and uploaded
    • Black and white or colour copy is accepted
    Issue
    • Contractor Owner
    • Expiry date to be recorded as
    Date of document approval by WHCImage Removed
    • 3 years from issue date