Competency | Competency Requirements | Upload requirements | Examples |
---|---|---|---|
Safety.Induction.Open Cut and Generic ATUI Form Or Safety. Induction. Underground and Generic ATUI Form Click HERE to access a copy of the form |
The form should be fully completed to be accepted
All 6 pages of the form must be |
The contract owner or Contract coordinator always needs to sign.
The mechanical or electrical is only required if the role is linked to any mechanical or electrical role.
The Manager of Mining engineering
uploaded Only version 16 will be accepted PAGE 1
**PAGE 1 - Additional Requirements
|
|
|
- The Manager of Mining engineering (MME) needs to sign onto the form for anyone that selected the role titled 'All Open Cut - Operator') .
NOTE: Gunnedah CHPP does not have a MME – therefore this signature is not required for applicants that have indicated Gunnedah CHPP is their primary WHC site even if the 'All Open Cut - Operator' role has been chosen.
Only version 8 ,9 and 10 will be accepted.
Note: The Whitehaven Coal Induction Information Form issued by Pegasus is not an acceptable form for this competency upload
PAGE 2
PAGE 3
PAGES 4, 5 & 6
Form must be no older than 3 months – refer to the latest sign off date in the approvals section. | Pegasus staff CLICK HERE for additional business rule information prior to verification of competency Issue Date - the latest date in the approval section Expiry - 3 years from the issue date | ||
Site.Induction.LANDOWNERS SITE ACCESS INDUCTION | Acceptable evidence:
|
|