This competency is required for ALL PERSONNEL (Employees and Contractors) PRIOR to accessing site for the first time
  • Participant details to match applicant
  • Status must be 'Passed' 

For a 6 month transition period Yara Pilbara will accept the following as evidence of training completed prior to May 2023

1. Shall be on Yara issued placeholder certificate
2. Course Code and Title to match 
3. Participant details to match applicant
4. Company must match applicant registered company
5. Issue date: Use date of issue

Exemption Process:

An exemption may be granted for a training competency requirement listed in the Training Matrices for an  employee or contractor. Exemptions shall be applied only after careful consideration and risk assessment. Yara Employee applications for training exemptions shall be approved by the relevant Department Manager. Contractor applications for training exemptions shall be approved by the relevant Yara Responsible Person.

To be deemed valid the request shall be:

  1. Documented on Yara’s Training & Competency Exemption Form [TRG-YP-FRM-125-09]
  2. Participant details to match applicant
  3. Course Code and Title to match
  4. Shall be ‘approved’
  5. Issue date: Use date of issue
  6. Expire date: As listed on the form
  7. Shall have approver role, name and signature.

For employees, this competency may be completed after commencement of employment

For contractors, this competency must be completed PRIOR to working with or under a Permit

  • Participant details to match applicant
  • Status must be 'Passed'

For a 6 month transition period Yara Pilbara will accept the following as evidence of training completed prior to May 2023

1. Shall be on Yara issued placeholder certificate
2. Course Code and Title to match 
3. Participant details to match applicant
4. Company must match applicant registered company
5. Issue date: Use date of issue

Exemption Process:

An exemption may be granted for a training competency requirement listed in the Training Matrices for an  employee or contractor. Exemptions shall be applied only after careful consideration and risk assessment. Yara Employee applications for training exemptions shall be approved by the relevant Department Manager. Contractor applications for training exemptions shall be approved by the relevant Yara Responsible Person.

To be deemed valid the request shall be:

  1. Documented on Yara’s Training & Competency Exemption Form [TRG-YP-FRM-125-09]
  2. Participant details to match applicant
  3. Course Code and Title to match
  4. Shall be ‘approved’
  5. Issue date: Use date of issue
  6. Expire date: As listed on the form
  7. Shall have approver role, name and signature.
This competency is required PRIOR to accessing site for the first time
  • Participant details to match applicant
  • Status must be 'Passed' 

For a 6 month transition period Yara Pilbara will accept the following as evidence of training completed prior to May 2023

1. Shall be on Yara issued placeholder certificate
2. Course Code and Title to match 
3. Participant details to match applicant
4. Company must match applicant registered company
5. Issue date: Use date of issue
6. Expire date: 2 years from issue date

Exemption Process:

An exemption may be granted for a training competency requirement listed in the Training Matrices for an  employee or contractor. Exemptions shall be applied only after careful consideration and risk assessment. Yara Employee applications for training exemptions shall be approved by the relevant Department Manager. Contractor applications for training exemptions shall be approved by the relevant Yara Responsible Person.

To be deemed valid the request shall be:

  1. Documented on Yara’sTRG-YP-FRM-125-09 Training & Competency Exemption Form.pdfTraining & Competency Exemption Form [TRG-YP-FRM-125-09]
  2. Participant details to match applicant
  3. Course Code and Title to match
  4. Shall be ‘approved’
  5. Issue date: Use date of issue
  6. Expire date: As listed on the form
  7. Shall have approver role, name and signature.

For employees, this competency may be completed after commencement of employment

For contractors, this competency must be completed PRIOR to working with or under a Permit

  • Participant details to match applicant
  • Status must be 'Passed'

For a 6 month transition period Yara Pilbara will accept the following as evidence of training completed prior to May 2023

1. Shall be on Yara issued placeholder certificate
2. Course Code and Title to match 
3. Participant details to match applicant
4. Company must match applicant registered company
5. Issue date: Use date of issue

Exemption Process:

An exemption may be granted for a training competency requirement listed in the Training Matrices for an  employee or contractor. Exemptions shall be applied only after careful consideration and risk assessment. Yara Employee applications for training exemptions shall be approved by the relevant Department Manager. Contractor applications for training exemptions shall be approved by the relevant Yara Responsible Person.

To be deemed valid the request shall be:

  1. Documented on Yara’s Training & Competency Exemption Form [TRG-YP-FRM-125-09]
  2. Participant details to match applicant
  3. Course Code and Title to match
  4. Shall be ‘approved’
  5. Issue date: Use date of issue
  6. Expire date: As listed on the form
  7. Shall have approver role, name and signature.

For employees, this competency may be completed after commencement of employment

For contractors, this competency must be completed PRIOR to working with or under a Permit

  • Participant details to match applicant
  • Status must be 'Passed'

For a 6 month transition period Yara Pilbara will accept the following as evidence of training completed prior to May 2023

1. Shall be on Yara issued placeholder certificate
2. Course Code and Title to match 
3. Participant details to match applicant
4. Company must match applicant registered company
5. Issue date: Use date of issue

Exemption Process:

An exemption may be granted for a training competency requirement listed in the Training Matrices for an  employee or contractor. Exemptions shall be applied only after careful consideration and risk assessment. Yara Employee applications for training exemptions shall be approved by the relevant Department Manager. Contractor applications for training exemptions shall be approved by the relevant Yara Responsible Person.

To be deemed valid the request shall be:

  1. Documented on Yara’sTRG-YP-FRM-125-09 Training & Competency Exemption Form.pdfTraining & Competency Exemption Form [TRG-YP-FRM-125-09]
  2. Participant details to match applicant
  3. Course Code and Title to match
  4. Shall be ‘approved’
  5. Issue date: Use date of issue
  6. Expire date: As listed on the form
  7. Shall have approver role, name and signature.
This competency is required PRIOR to accessing Perth Office for the first time
  • Participant details to match applicant
  • Status must be 'Passed' 

Exemption Process:

An exemption may be granted for a training competency requirement listed in the Training Matrices for an  employee or contractor. Exemptions shall be applied only after careful consideration and risk assessment. Yara Employee applications for training exemptions shall be approved by the relevant Department Manager. Contractor applications for training exemptions shall be approved by the relevant Yara Responsible Person.

To be deemed valid the request shall be:

  1. Documented on Yara’sTRG-YP-FRM-125-09 Training & Competency Exemption Form.pdfTraining & Competency Exemption Form [TRG-YP-FRM-125-09]
  2. Participant details to match applicant
  3. Course Code and Title to match
  4. Shall be ‘approved’
  5. Issue date: Use date of issue
  6. Expire date: As listed on the form
  7. Shall have approver role, name and signature.
This competency may be completed after commencement of employment
  • Participant details to match applicant
  • Status must be 'Passed'

Exemption Process:

An exemption may be granted for a training competency requirement listed in the Training Matrices for an  employee or contractor. Exemptions shall be applied only after careful consideration and risk assessment. Yara Employee applications for training exemptions shall be approved by the relevant Department Manager. Contractor applications for training exemptions shall be approved by the relevant Yara Responsible Person.

To be deemed valid the request shall be:

  1. Documented on Yara’sTRG-YP-FRM-125-09 Training & Competency Exemption Form.pdfTraining & Competency Exemption Form [TRG-YP-FRM-125-09]
  2. Participant details to match applicant
  3. Course Code and Title to match
  4. Shall be ‘approved’
  5. Issue date: Use date of issue
  6. Expire date: As listed on the form
  7. Shall have approver role, name and signature.
Competency Competency Requirements Upload RequirementsExamples

Yara eLearning.ELE023.Visitor Induction

This competency is required for all VISITORS PRIOR to accessing site for the first time

  • Participant details to match applicant
  • Status must be 'Passed'


Exemption Process:

An exemption may be granted for a training competency requirement listed in the Training Matrices for

an 

an employee or contractor. Exemptions shall be applied only after careful consideration and risk assessment.

Yara Employee applications for training exemptions shall be approved by the relevant Department Manager. Contractor applications for training exemptions shall be approved by the relevant Yara Responsible Person.

To be deemed valid the request shall be:

Documented on Yara’s Training & Competency Exemption Form [TRG-YP-FRM-125-09]

Please click here for the template and business rules.

Issue date = Use the date of completion / pass

Expiry date = 6 month from issue 


Yara eLearning.ELE024.TAN Carrier Induction

This competency is required for TAN CARRIER DRIVERS PRIOR to accessing site for the first time
Issue date:
  • Participant details to match applicant
  • Course Code and Title to match
  • Shall be ‘approved’
    • Status must be 'Passed'

    For a 6 month transition period Yara Pilbara will accept the following as evidence of training completed prior to May 2023

    1. Shall be on Yara issued placeholder certificate
    2. Course Code and Title to match 
    3. Participant details to match applicant
    4. Company must match applicant registered company
    5. Issue date: Use date of issue
    6. Expire date:

    As listed on the form
  • Shall have approver role, name and signature.
  • Avetta verifier click here for additional business rule prior to verification of this competency

    Issue date = Use the date of completion / pass
    Expiry date = 6 month from issue 

    Yara eLearning.ELE024.TAN Carrier Induction

    This competency is required for TAN CARRIER DRIVERS PRIOR to accessing site for the first time
    • Participant details to match applicant
    • Status must be 'Passed'

    For a 6 month transition period Yara Pilbara will accept the following as evidence of training completed prior to May 2023

    1. Shall be on Yara issued placeholder certificate
    2. Course Code and Title to match 
    3. Participant details to match applicant
    4. Company must match applicant registered company
    5. Issue date: Use date of issue
    6. Expire date: 6 months from issue date6 months from issue date


    Yara Pilbara will also accept placeholder certificates for Yara eLearning.ELE001.Yara Induction & Yara eLearning.ELE002.Yara TAN Plant Induction for TAN Carriers. Note: Placeholders for both Yara Induction and Yara TAN Plant Induction are required for acceptance. Expiry Date to be entered as the earliest date of expiry for either induction.


    Exemption Process:

    An exemption may be granted for a training competency requirement listed in the Training Matrices for an employee or contractor. Exemptions shall be applied only after careful consideration and risk assessment. Please click here for the template and business rules.

    Avetta verifiers click here for additional information prior to verification of this competency

    Issue date = Use the date of completion / pass

    Expiry date = 6 month from issue 


    Yara.eLearning.ELE025.Turnaround Induction 2023

    This competency is required for all VISITORS PRIOR to accessing site for the first time

    • Participant details to match applicant
    • Status must be 'Passed'


    Exemption Process:

    An exemption may be granted for a training competency requirement listed in the Training Matrices for

    an 

    an employee or contractor. Exemptions shall be applied only after careful consideration and risk assessment.

    Yara Employee applications for training exemptions shall be approved by the relevant Department Manager. Contractor applications for training exemptions shall be approved by the relevant Yara Responsible Person.

    To be deemed valid the request shall be:

    Documented on Yara’s Training & Competency Exemption Form [TRG-YP-FRM-125-09]

    Please click here for the template and business rules.

    Avetta verifiers click here for additional information prior to verification of this competency

    Issue date = Use the date of completion / pass

    Expiry date = 6 month from issue 


    Yara eLearning.ELE001.Yara Induction

    This competency is required for ALL PERSONNEL (Employees and Contractors) PRIOR to accessing site for the first time
    Exception - those personnel accessing site as a visitor
    Issue date
    • Participant details to match applicant
  • Course Code and Title to match
  • Shall be ‘approved’
    • Status must be 'Passed'

    For a 6 month transition period Yara Pilbara will accept the following as evidence of training completed prior to May 2023

    1. Shall be on Yara issued placeholder certificate
    2. Course Code and Title to match 
    3. Participant details to match applicant
    4. Company must match applicant registered company
    5. Issue date: Use date of issue
    6. Expire date:

    As listed on the form
  • Shall have approver role, name and signature.
  • Avetta verifier

    2 years from issue date


    Exemption Process:

    An exemption may be granted for a training competency requirement listed in the Training Matrices for an employee or contractor. Exemptions shall be applied only after careful consideration and risk assessment. Please click here for the template and business rules.

    Avetta verifiers click here for additional business rule information prior to verification of this competency

    Issue date = Use the date of completion / pass

    Expiry date = 6 month 2 years from issue 


    Yara . eLearning.ELE025.Turnaround Induction 2023ELE002.Yara TAN Plant Induction This competency is required for all VISITORS ALL PERSONNEL (Employees and Contractors) PRIOR to accessing the TAN PLANT site for the first time
    • Participant details to match applicant
    • Status must be 'Passed'

    Exemption Process:

    An exemption may be granted for a training competency requirement listed in the Training Matrices for an  employee or contractor. Exemptions shall be applied only after careful consideration and risk assessment. Yara Employee applications for training exemptions shall be approved by the relevant Department Manager. Contractor applications for training exemptions shall be approved by the relevant Yara Responsible Person.

    To be deemed valid the request shall be:

  • Documented on Yara’s Training & Competency Exemption Form [TRG-YP-FRM-125-09]
  • Participant details to match applicant
  • Course Code and Title to match
  • Shall be ‘approved’
  • For a 6 month transition period Yara Pilbara will accept the following as evidence of training completed prior to May 2023

    1. Shall be on Yara issued placeholder certificate
    2. Course Code and Title to match 
    3. Participant details to match applicant
    4. Company must match applicant registered company
    5. Issue date: Use date of issue
    6. Expire date:

    As listed on the form
  • Shall have approver role, name and signature.
  • Avetta verifier

    2 years from issue date


    Exemption Process:

    An exemption may be granted for a training competency requirement listed in the Training Matrices for an employee or contractor. Exemptions shall be applied only after careful consideration and risk assessment. Please click here for the template and business rules.

    Avetta verifiers click here for additional business rule information prior to verification of this competency

    Issue date = Use the date of completion / pass

    Expiry date = 6 month 2 years from issue 


    Yara eLearning.ELE001ELE011.Yara InductionMuster Marshal (Part 1)This competency is required for ALL PERSONNEL (Employees and Contractors) PRIOR to accessing site for the first time
    Exception - those personnel accessing site as a visitor
    • Participant details to match applicant
    • Status must be 'Passed' 

    For a 6 month transition period Yara Pilbara will accept the following as evidence of training completed prior to May 2023

    1. Shall be on Yara issued placeholder certificate
    2. Course Code and Title to match 
    3. Participant details to match applicant
    4. Company must match applicant registered company
    5. Issue date: Use date of issue
    6. Expire date: 2 years from issue date


    Exemption Process:

    An exemption may be granted for a training competency requirement listed in the Training Matrices for

    an 

    an employee or contractor. Exemptions shall be applied only after careful consideration and risk assessment.

    Yara Employee applications for training exemptions shall be approved by the relevant Department Manager. Contractor applications for training exemptions shall be approved by the relevant Yara Responsible Person.

    To be deemed valid the request shall be:

    Documented on Yara’s Training & Competency Exemption Form [TRG-YP-FRM-125-09]

    Please click here for the template and business rules.

    Avetta verifiers click here for additional information prior to verification of this competency

    Issue date = Use the date of completion / pass


    Yara eLearning.ELE012.Yara Risk Management

    For employees, this competency may be completed after commencement of employment

    For contractors, this competency must be completed PRIOR to working with or under a Permit

    Yara eLearning.ELE002.Yara TAN Plant Induction This competency is required for ALL PERSONNEL (Employees and Contractors) PRIOR to accessing the TAN PLANT site for the first time
    • Participant details to match applicant
  • Course Code and Title to match
  • Shall be ‘approved’
  • Issue date: Use date of issue
  • Expire date: As listed on the form
  • Shall have approver role, name and signature.
  • Avetta verifier click here for additional business rule prior to verification of this competency

    Issue date = Use the date of completion / pass
    Expiry date = 2 years from issue 

    • Participant details to match Status must be 'Passed'

    For a 6 month transition period Yara Pilbara will accept the following as evidence of training completed prior to May 2023

    1. Shall be on Yara issued placeholder certificate
    2. Course Code and Title to match 
    3. Participant details to match applicant
    4. Company must match applicant registered company
    5. Issue date: Use date of issue


    Yara Pilbara will also accept a scodle progress report providing this report shows completion of the 'Yara Risk Management' Module


    Exemption Process:

    An exemption may be granted for a training competency requirement listed in the Training Matrices for an employee or contractor. Exemptions shall be applied only after careful consideration and risk assessment. Please click here for the template and business rules.

    Avetta verifiers click here for additional information prior to verification of this competency

    Issue date = Use the date of completion / pass


    Yara eLearning.ELE013.Yara Permit Worker This competency is required PRIOR to accessing site for the first time
    • Participant details to match applicant
    • Status must be 'Passed' 

    For a 6 month transition period Yara Pilbara will accept the following as evidence of training completed prior to May 2023

    1. Shall be on Yara issued placeholder certificate
    2. Course Code and Title to match 
    3. Participant details to match applicant
    4. Company must match applicant registered company
    5. Issue date: Use date of issue
    6. Expire date: 2 years from issue date


    Exemption Process:

    An exemption may be granted for a training competency requirement listed in the Training Matrices for

    an 

    an employee or contractor. Exemptions shall be applied only after careful consideration and risk assessment.

    Yara Employee applications for training exemptions shall be approved by the relevant Department Manager. Contractor applications for training exemptions shall be approved by the relevant Yara Responsible Person.

    To be deemed valid the request shall be:

    1. Documented on Yara’sTRG-YP-FRM-125-09 Training & Competency Exemption Form.pdfTraining & Competency Exemption Form [TRG-YP-FRM-125-09]
    2. Participant details to match applicant
    3. Course Code and Title to match
    4. Shall be ‘approved’
    5. Issue date: Use date of issue
    6. Expire date: As listed on the form
    7. Shall have approver role, name and signature.

    Avetta verifier click here for additional business rule prior to verification of this competency

    Issue date = Use the date of completion / pass
    Expiry date = 2 years from issue 

    Yara eLearning.ELE011.Yara Muster Marshal (Part 1)

    Avetta verifier click here for additional business rule prior to verification of this competency

    Issue date = Use the date of completion / pass

    Yara eLearning.ELE012.Yara Risk Management

    Avetta verifier click here for additional business rule prior to verification of this competency

    Issue date = Use the date of completion / pass

    Yara eLearning.ELE013.Yara Permit Worker 

    Avetta verifier click here for additional business rule prior to verification of this competency

    Issue date = Use the date of completion / pass
    Expiry date = 2 years from issue 

    Yara eLearning.ELE014.Yara Fire Awareness

    Avetta verifier click here for additional business rule prior to verification of this competency

    Issue date = Use the date of completion / pass

    Yara eLearning.ELE022. Hearing Conservation

    Avetta verifier click here for additional business rule prior to verification of this competency

    Issue date = Use the date of completion / pass

    Yara.eLearning.ELE003 Perth Building Emergency Management

    Avetta verifier click here for additional business rule prior to verification of this competency

    Issue date = Use the date of completion / pass
    Expiry date = 2 years from issue

    Yara.eLearning.ELE005 Yara Heat Stress

    Avetta verifier click here for additional business rule prior to verification of this competency

    Issue date = Use the date of completion / pass

    Yara.eLearning.ELE006 Yara Cyclone AwarenessThis competency may be completed after commencement of employment
    • Participant details to match applicant
    • Status must be 'Passed'

    Exemption Process:

    An exemption may be granted for a training competency requirement listed in the Training Matrices for an  employee or contractor. Exemptions shall be applied only after careful consideration and risk assessment. Yara Employee applications for training exemptions shall be approved by the relevant Department Manager. Contractor applications for training exemptions shall be approved by the relevant Yara Responsible Person.

    To be deemed valid the request shall be:

    1. Documented on Yara’sTRG-YP-FRM-125-09 Training & Competency Exemption Form.pdfTraining & Competency Exemption Form [TRG-YP-FRM-125-09]
    2. Participant details to match applicant
    3. Course Code and Title to match
    4. Shall be ‘approved’
    5. Issue date: Use date of issue
    6. Expire date: As listed on the form
    7. Shall have approver role, name and signature.
    Avetta verifier click here for additional business rule

    Please click here for the template and business rules.

    Avetta verifiers click here for additional information prior to verification of this competency

    Issue date = Use the date of completion / pass

    Expiry date = 2 years from issue 


    Yara eLearning.ELE014.Yara Fire Awareness

    For employees, this competency may be completed after commencement of employment

    For contractors, this competency must be completed PRIOR to working with or under a Permit

    • Participant details to match applicant
    • Status must be 'Passed'

    For a 6 month transition period Yara Pilbara will accept the following as evidence of training completed prior to May 2023

    1. Shall be on Yara issued placeholder certificate
    2. Course Code and Title to match 
    3. Participant details to match applicant
    4. Company must match applicant registered company
    5. Issue date: Use date of issue


    Exemption Process:

    An exemption may be granted for a training competency requirement listed in the Training Matrices for an employee or contractor. Exemptions shall be applied only after careful consideration and risk assessment. Please click here for the template and business rules.

    Avetta verifiers click here for additional information prior to verification of this competency

    Issue date = Use the date of completion / pass
    Expiry date = 1 years from issue 


    Yara eLearning.eLearning.ELE007 Yara Fatigue ManagementThis competency may be completed after commencement of employmentELE022. Hearing Conservation

    For employees, this competency may be completed after commencement of employment

    For contractors, this competency must be completed PRIOR to working with or under a Permit

    • Participant details to match applicant
    • Status must be 'Passed'

    Exemption Process:

    An exemption may be granted for a training competency requirement listed in the Training Matrices for an  employee or contractor. Exemptions shall be applied only after careful consideration and risk assessment. Yara Employee applications for training exemptions shall be approved by the relevant Department Manager. Contractor applications for training exemptions shall be approved by the relevant Yara Responsible Person.

    To be deemed valid the request shall be:

  • Documented on Yara’s Training & Competency Exemption Form [TRG-YP-FRM-125-09]
  • For a 6 month transition period Yara Pilbara will accept the following as evidence of training completed prior to May 2023

    1. Shall be on Yara issued placeholder certificate
    2. Course Code and Title to match 
    3. Participant details to match applicant

  • Course Code and Title to match
  • Shall be ‘approved’
  • Issue date: Use date of issue
  • Expire date: As listed on the form
  • Shall have approver role, name and signature.
  • Avetta verifier click here for additional business rule

    4. Company must match applicant registered company
    5. Issue date: Use date of issue


    Exemption Process:

    An exemption may be granted for a training competency requirement listed in the Training Matrices for an employee or contractor. Exemptions shall be applied only after careful consideration and risk assessment. Please click here for the template and business rules.

    Avetta verifiers click here for additional information prior to verification of this competency

    Issue date = Use the date of completion / pass


    Yara.eLearning.ELE008 Yara Walk Observe CommunicateThis competency may be completed after commencement of employmentELE003 Perth Building Emergency ManagementThis competency is required PRIOR to accessing Perth Office for the first time
    • Participant details to match applicant
    • Status must be 'Passed' 


    Exemption Process:

    An exemption may be granted for a training competency requirement listed in the Training Matrices for

    an 

    an employee or contractor. Exemptions shall be applied only after careful consideration and risk assessment.

    Yara Employee applications for training exemptions shall be approved by the relevant Department Manager. Contractor applications for training exemptions shall be approved by the relevant Yara Responsible Person.

    To be deemed valid the request shall be:

    Documented on Yara’s Training & Competency Exemption Form [TRG-YP-FRM-125-09]

    Please click here for the template and business rules.

    Issue date = Use the date of completion / pass

    Expiry date = 2 years from issue


    Yara.eLearning.ELE005 Yara Heat StressThis competency may be completed after commencement of employment
    • Participant details to match applicant
  • Course Code and Title to match
  • Shall be ‘approved’
  • Issue date: Use date of issue
  • Expire date: As listed on the form
  • Shall have approver role, name and signature.
  • Avetta verifier click here for additional business rule prior to verification of this competency
    • Status must be 'Passed'


    Exemption Process:

    An exemption may be granted for a training competency requirement listed in the Training Matrices for an employee or contractor. Exemptions shall be applied only after careful consideration and risk assessment. Please click here for the template and business rules.

    Issue date = Use the date of completion / pass


    Yara.eLearning.ELE018 ELE006 Yara STARLIMSCyclone AwarenessThis competency may be completed after commencement of employment
    • Participant details to match applicant
    • Status must be 'Passed'


    Exemption Process:

    An exemption may be granted for a training competency requirement listed in the Training Matrices for

    an 

    an employee or contractor. Exemptions shall be applied only after careful consideration and risk assessment.

    Yara Employee applications for training exemptions shall be approved by the relevant Department Manager. Contractor applications for training exemptions shall be approved by the relevant Yara Responsible Person.

    To be deemed valid the request shall be:

    Documented on Yara’sTRG-YP-FRM-125-09 Training & Competency Exemption Form.pdfTraining & Competency Exemption Form [TRG-YP-FRM-125-09]

    Please click here for the template and business rules.

    Issue date = Use the date of completion / pass

    Expiry date = 1 years from issue 


    Yara.eLearning.ELE007 Yara Fatigue ManagementThis competency may be completed after commencement of employment
    • Participant details to match applicant
  • Course Code and Title to match
  • Shall be ‘approved’
  • Issue date: Use date of issue
  • Expire date: As listed on the form
  • Shall have approver role, name and signature.
  • Avetta verifier click here for additional business rule prior to verification of this competency
    • Status must be 'Passed'


    Exemption Process:

    An exemption may be granted for a training competency requirement listed in the Training Matrices for an employee or contractor. Exemptions shall be applied only after careful consideration and risk assessment. Please click here for the template and business rules.

    Issue date = Use the date of completion / pass


    Yara.eLearning.ELE019 Yara Manual HandlingELE008 Yara Walk Observe CommunicateThis competency may be completed after commencement of employment
    • Participant details to match applicant
    • Status must be 'Passed' 


    Exemption Process:

    An exemption may be granted for a training competency requirement listed in the Training Matrices for

    an 

    an employee or contractor. Exemptions shall be applied only after careful consideration and risk assessment.

    Yara Employee applications for training exemptions shall be approved by the relevant Department Manager. Contractor applications for training exemptions shall be approved by the relevant Yara Responsible Person.

    To be deemed valid the request shall be:

    Documented on Yara’s Training & Competency Exemption Form [TRG-YP-FRM-125-09]

    Please click here for the template and business rules.

    Issue date = Use the date of completion / pass


    Yara.eLearning.ELE018 Yara STARLIMSThis competency may be completed after commencement of employment
    • Participant details to match applicant
  • Course Code and Title to match
  • Shall be ‘approved’
  • Issue date: Use date of issue
  • Expire date: As listed on the form
  • Shall have approver role, name and signature.
  • Avetta verifier click here for additional business rule prior to verification of this competency
    • Status must be 'Passed'


    Exemption Process:

    An exemption may be granted for a training competency requirement listed in the Training Matrices for an employee or contractor. Exemptions shall be applied only after careful consideration and risk assessment. Please click here for the template and business rules.

    Issue date = Use the date of completion / pass


    Yara.eLearning.ELE020 ELE019 Yara ChemAlertManual HandlingThis competency may be completed after commencement of employment
    • Participant details to match applicant
    • Status must be 'Passed' 


    Exemption Process:

    An exemption may be granted for a training competency requirement listed in the Training Matrices for

    an 

    an employee or contractor. Exemptions shall be applied only after careful consideration and risk assessment.

    Yara Employee applications for training exemptions shall be approved by the relevant Department Manager. Contractor applications for training exemptions shall be approved by the relevant Yara Responsible Person.

    To be deemed valid the request shall be:

  • Documented on Yara’s Training & Competency Exemption Form [TRG-YP-FRM-125-09]
  • Please click here for the template and business rules.

    Issue date = Use the date of completion / pass


    Yara.eLearning.ELE020 Yara ChemAlertThis competency may be completed after commencement of employment
    • Participant details to match applicant
  • Course Code and Title to match
  • Shall be ‘approved’
  • Issue date: Use date of issue
  • Expire date: As listed on the form
  • Shall have approver role, name and signature.
  • Avetta verifier click here for additional business rule prior to verification of this competency
    • Status must be 'Passed' 


    Exemption Process:

    An exemption may be granted for a training competency requirement listed in the Training Matrices for an employee or contractor. Exemptions shall be applied only after careful consideration and risk assessment. Please click here for the template and business rules.

    Issue date = Use the date of completion / pass


    External.Course.EXT095 . Construction White Card

    Name on licence/card to match person registered (however shortened versions such as 'Chris' for 'Christopher' are acceptable)

    Must be a OHS Construction induction card card from state Government/Worksafe

    Licence/Card number to be displayed

    Only the front side of this card is required to be uploaded.

    Black and white copies can be accepted but is not preferred

    Scanned document to be clearly legible

    A confirmation letter or form that shows evidence of having ordered a replacement card issued by the Government/Worksafe will be accepted

    Exemption Process:

    An exemption may be granted for a training competency requirement listed in the Training Matrices for an  employee or contractor. Exemptions shall be applied only after careful consideration and risk assessment. Yara Employee applications for training exemptions shall be approved by the relevant Department Manager. Contractor applications for training exemptions shall be approved by the relevant Yara Responsible Person.

    To be deemed valid the request shall be:

    1. Documented on Yara’s Training & Competency Exemption Form [TRG-YP-FRM-125-09]
    2. Participant details to match applicant
    3. Course Code and Title to match
    4. Shall be ‘approved’
    5. Issue date: Use date of issue
    6. Expire date: As listed on the form
    7. Shall have approver role, name and signature.
    Card

    Must be either:

    • A statement of attainment or card issued by RTO showing either:
        • CPCCOHS1001A
        • CPCCWHS1001 or;
        • CPCWHS1001

    OR

    • An OHS Construction induction card from Australian state Government/Worksafe. Only the front side of this card is required to be uploaded

    OR

    • A confirmation letter or form that shows evidence of having ordered a replacement card issued by the Government/Worksafe will be accepted

    OR

    • The Digital version of the NSW White Card can be accepted

    OR

    • A database extract for Construction White Card


    For each of the above:

          • Name on licence/card to match person registered (however shortened versions such as 'Chris' for 'Christopher' are acceptable)
          • Licence/Card number to be displayed on all except SOA
          • Black and white copies can be accepted but is not preferred
          • Scanned document to be clearly legible


    Exemption Process:

    An exemption may be granted for a training competency requirement listed in the Training Matrices for an employee or contractor. Exemptions shall be applied only after careful consideration and risk assessment. Please click here for the template and business rules.

    Avetta verifiers click here for additional business rule information prior to verification of this competency

    • Issue date = Use the date of completion / pass