Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.
Comment: #14181272 - ATUI document link update


 

Image RemovedImage Added


CompetencyCompetency RequirementsUpload requirementsExamples

Safety.Induction.Open Cut and Generic ATUI Form

Or

Safety. Induction. Underground and Generic ATUI Form 


Click HERE to access a copy of the form










All 6 pages of the form must be uploaded

Page

Only version 16 will be accepted

PAGE 1 

  • Name
of inductee must
  • to match registering person
  • Position must be completed
  • Contractor Company must be completed
WHC Contract Owner or Coordinator email – NOT MANDATORY
  • Must select Primary WHC site
 and all sections must be completed.
  • Induction(s) required – must be completed
  • Approval section:

The contract owner or coordinator needs to be listed, they must sign and date.
The mechanical or electrical is only required if the role is linked to any mechanical or electrical role.The Manager of Mining engineering

**PAGE 1 - Additional Requirements

  • For Trades roles (any roles including ‘Tradesperson’ in the name): The ATUI must include sign off by a person on the authorised approvers list relevant to the role and site. Eg. Electrical roles to be signed by Manager Electrical Engineering, Mechanical Tradesperson roles to be signed off by Mechanical Engineering Manager with the exception of All Open Cut – Other Tradesperson, which can be signed by either the Electrical or Mechanical Engineering Manager relevant to the site.
  • All Open Cut – Operator (must be signed off by the Manager of Mining Engineering (MME) or Fixed Plant and CHPP Manager
  • Narrabri - The Manager of Mining Engineering (MME) needs to sign for
the role 'All Open Cut - Operator'.

NOTE: Gunnedah CHPP does not have a MME – therefore this signature is not required for applicants that have indicated Gunnedah CHPP as their primary WHC site even if the 'All Open Cut - Operator' role has been chosen.

Page 2 

    • Inductions; Check list must be completed

Page 3 

    • Roles; A role in the Open Cut section must be selected

Page 4, 5 & 6 

    • Complete if applicable  

 

Only version 10 & 11 will be accepted. Version 10 accepted until 31st March 2019 

Image Removed

Image Removed
  • ALL underground trades and Operator roles.
  • Narrabri - MME sign off not needed for surface role at Narrabri OR for re-inductees


PAGE 2

  • Can be completed at contracting company's leisure; used as reference rather than requirement

PAGE 3 

  • Roles that have been selected on the form must match exactly to the portal
  • Roles - Where Narrabri Surface (or Underground) is selected as the primary site on page 1 a Narrabri Surface (or Underground)role must be selected.

PAGES 4, 5 & 6

  • Complete if applicable  

Form must be no older than 3 months – refer to the latest sign off date in the approvals section.

Pegasus staff CLICK HERE for additional business rule information prior to verification of competency

Issue Date - the latest date in the approval section

Expiry - 3 years from the issue date


Site.Induction.LANDOWNERS SITE ACCESS INDUCTION

Acceptable evidence:

  • Must be a Statement of completion - PACS - PROPERTY ACCESS INDUCTION 
  • Must show completion of Winchester Downs Property Access Induction
  • Name to match the person registered.
  • Issue Date: as per the issue date identified on the Statement of completion.