Competency | Competency Requirements | Upload requirements | Examples |
---|---|---|---|
Safety.Induction.Open Cut and Generic ATUI Form Or Safety. Induction. Underground and Generic ATUI Form Click HERE to access a copy of the form | All 6 pages of the form must be uploaded |
Only version 16 will be accepted PAGE 1
|
|
|
|
The contract owner or coordinator needs to be listed, they must sign and date.
The mechanical or electrical is only required if the role is linked to any mechanical or electrical role.The Manager of Mining engineering
**PAGE 1 - Additional Requirements
|
NOTE: Gunnedah CHPP does not have a MME – therefore this signature is not required for applicants that have indicated Gunnedah CHPP as their primary WHC site even if the 'All Open Cut - Operator' role has been chosen.
Page 2
- Inductions; Check list must be completed
Page 3
- Roles; A role in the Open Cut section must be selected
Page 4, 5 & 6
- Complete if applicable
Only version 10 & 11 will be accepted. Version 10 accepted until 31st March 2019
PAGE 2
PAGE 3
PAGES 4, 5 & 6
Form must be no older than 3 months – refer to the latest sign off date in the approvals section. | Pegasus staff CLICK HERE for additional business rule information prior to verification of competency Issue Date - the latest date in the approval section Expiry - 3 years from the issue date | ||
Site.Induction.LANDOWNERS SITE ACCESS INDUCTION | Acceptable evidence:
|
|