Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

Image RemovedImage Added


Business Type Authorisation Local buying
Expand
titleRegistration Approval Business Authorisation

Anchor
registrationapproval
registrationapproval

CertificationCertification RequirementsUpload RequirementsExamples
Business Type Authorisation Company
  • Business Name needs to match. If it doesn't match, government certified evidence must be provided to link the business names together. This is ideally a letter or download from ABR showing the linkage
  • We can accept ‘PTY LTD’ or ‘(Pty) Ltd’  in lieu of ‘Proprietary Limited’ when this is the only difference in the company name between what’s shown on company compliance paperwork verse what’s shown in onsite.

  • Must be the BHP Mt Arthur Coal Approval Form (please refer to the example document). This will be issued to you from BHP Mt Arthur Coal and you must save the email as a PDF and upload as authorisation to register in this pre-qualification process.
  • Company checkbox must be selected

Issue Date = Date Approved

Expiry Date not required

Image Removed

Prequalification Approval Notification – Company /

Prequalification Approval Notification – Sub Contractor /

Prequalification Approval Notification – Local Buying

  • Business Name needs to match. If it doesn't match, government certified evidence must be provided to link the business names together. This is ideally a letter or download from ABR showing the linkage
  • We can accept ‘PTY LTD’ or ‘(Pty) Ltd’  in lieu of ‘Proprietary Limited’ when this is the only difference in the company name between what’s shown on company compliance paperwork verse what’s shown in onsite.

  • Must be the BHP Mt Arthur Coal Prequalification Approval Form (please refer to the example document). This will be issued to you from BHP Mt Arthur Coal and you must save the email as a PDF and upload as authorisation to register in this pre-qualification process.
Local buying checkbox must be selectedBusiness Type Authorisation Subcontractor
  • Business Name needs to match. If it doesn't match, government certified evidence must be provided to link the business names together. This is ideally a letter or download from ABR showing the linkage
  • We can accept ‘PTY LTD’ or ‘(Pty) Ltd’  in lieu of ‘Proprietary Limited’ when this is the only difference in the company name between what’s shown on company compliance paperwork verse what’s shown in onsite.

  • Must be the BHP Mt Arthur Coal Approval Form (please refer to the example document). This will be issued to you from BHP Mt Arthur Coal and you must save the email as a PDF and upload as authorisation to register in this pre-qualification process.
  • Subcontractor checkbox must be selected

Issue Date = Date Approved

Expiry Date not required



Issue Date = Date Approved

Expiry Date not required



Expand
titleQuality Management

Anchor
qualitymanagement
qualitymanagement

CertificationCertification RequirementsUpload RequirementsExamples

Quality Management Policy

  • Official Certification, i.e. ISO
  • OR
  • Letter on Company letterhead
  • Must be
signed within the last 12 months
  • current.
  • Signed by Senior manager
    A
seniors
  • senior manager includes:
  • CEO
  • CFO
  • Director
  • Operations Manager
  • Safety Manager
 
  • Regional Manager


Issue date = as per policy (must be signed within

12 months prior to submission

validity period)

Expiry date = Not Required



Expand
titleSafety Management System

Anchor
sms
sms

CertificationCertification RequirementsUpload RequirementsExamples

Comply with Mt Arthur Coals Safety Management System

Click here to download a copy of the template 



  • Document must be on their Company Letterhead with the correct ABN number
  • Company to use content as outlined in the template. No change to wording.
  • The letter should be signed by a senior manager of the business stating their name and position
  • Dated with in the past 12 months
  • One pdf document per approval

Issue date required (must be dated within 12 months of

data

date of submission)

Expiry date not required

Operate under my own Safety Management System

Click here to download a copy of the template 

  • Document must be on their Company Letterhead with the correct ABN number
  • Company to use content as outlined in the template. No change to wording
  • The letter should be signed by a senior manager of the business stating their name and position
  • Dated with in the past 12 months

Issue date required (must be dated within 12 months of

data

date of submission)

Expiry date not required

Mt Arthur Coals SMS with approved Exceptions

Click here to download a copy of the template

  • Document must be on their Company Letterhead with the correct ABN number
  • Company to use content as outlined in the template. No change to wording
  • The letter should be signed by a senior manager of the business stating their name and position
  • Dated with in the past 12 months
  • Must include sign off by BHP Mt Arthur Coal Ross Carlson
  • Provide copies of procedures and risk assessments
  • One pdf document per approval

Issue date required (must be dated within 12 months of

data

date of submission)

Expiry date not required