Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.
Comment: Reverted from v. 13

Image RemovedImage Added


CompetencyCompetency RequirementsUpload RequirementsExamples
Mechanical.Appointed.Mr Arthur South Mechanical Appointment Form
  • Must be the Mt Arthur South 'Mechanical' Appointment Form
  • Must be form version 56.0
  • Name on appointment form to match the person registered
  • "Contractor Signature accepting appointments below section - " must be signed by the worker
  • Appointment form does NOT require Thiess signature prior to upload.

  • All sections of the form must be complete (section 5 can be incomplete)
  • Section 2 for Qualified Mechanical Tradesperson must be filledor Section 3 if they are Non-statutory Mechanical Worker. Both sections if they have multiple roles/appointments.

Click HERE to download the appointment form


  • No issue or expiry date 
Image Removed


Electrical.Appointed.Mt Arthur South Electrical Appointment Form
  • Must be the Mt Arthur South 'Electrical' Appointment Form
  • Name on appointment form to match the person registered
  • Must be form version 1.0
  • "Contractor Signature accepting appointments below section - " must be signed by the worker
  • Appointment form does NOT require Thiess signature prior to upload.All sections of the form must be complete (however "THIESS Electrical Engineer" section can be left blank)

Click HERE to download the appointment form


  • No issue or expiry date
Image Removed