Whitehaven Coal HSE Document Form 2
This business rule was last updated by WHC on 24.04.2018
Business Rule for Version 6.0 of the Whitehaven Coal HSE Document Form 2:
- Contracting company details must be displayed on form
- Contracting company details must match registered company details in Onsite
- Contractor Company Supervisor – listed
- Site/Area; WHC Contract Owner (class B & C); WHC contract Coordinator – must match details listed on FORM 1
- WHC Group Standards – OC and/or Narrabri mine section completed.
- Other relevant WHC standards or procedures – optional
- WHC (OC) and/or WHC (NCO) Approvals – must match FORM 1. Must have name printed, signed and dated. 1 Mine operator minimum or relevant manager must sign for his area for OC, U/G need 3 signatures for MME, electrical and mechanical Engineering
List of authorised approvers can be found HERE - Contractor Company Acknowledgement must be completed – the Class must match FORM 1, name needs to be inserted in statement.
- The class must be selected, to confirm that they agree to classification given
- Contractor company supervisor – Must have name printed, signature and dated.
- Approval – Must have name printed, signature and dated.
- Whitehaven Coal H&C Document Form 2 to be completed and uploaded
- Black and white or colour copy is accepted
NOTE: All people intending to work underground need Gerald Linde or Brian Williams to sign off on the ATUI (form 3) and Form 2 - MEM - all mechanical trades (Surface and UG) (Richard Hokin)
- EEM - all electrical trades (Surface and UG) (Chris Bentham)
- CHPP, Surface Civil and Engineering - (Aron Cane)
- Surface Drilling, Enviro, cultural Heritage and Tech Services - (Owen Salisbury or Dave Ellwood )
- Safety and Training - (Scott Ginnivan)
Example: If U/G mechanical trade then Gerald or Brian AND Richard Hokin to sign. If enviro work then only Owen or Dave to sign Business Rule for Version 7.0 of the Whitehaven Coal HSE Document Form 2: - Contract owners and coordinators to be listed for each site,
- Contract owner to approve form
- And contracting company to acknowledge their classification and sign form.
| Business Rule for Version 6.0 of the Whitehaven Coal HSE Document Form 2:
NOTE: This version of the document is only going to be acceptable until 18.07.2018 - From this date, only Version 7.0 will be acceptable
- Issue date to be recorded as Date of document approval by WHC
- Expiration date as per Whitehaven Coal Contractor Engagement Form 1 – valid for 3 years
Business Rule for Version 7.0 of the Whitehaven Coal HSE Document Form 2:
- Issue date to be recorded as Date of document approval by WHC
- Expiration date as per Whitehaven Coal Contractor Engagement Form 1 – valid for 3 years
Image Removed
| IF submitted by a Primary Contracting Company:
- Sub-contractor Company: must be listed and match a registered company in the system
- Primary Contracting Company: must be listed and match registered company in the system
- Primary Contractor Representative: must be listed
- WHC Contractor Owner Name: must be listed
- Site(s): must be ticked - Click HERE for a list of sites.
- Scope of work: must be completed
- Sub-contractor Management: must be completed
- Primary Contractor Representative (Acknowledgement): must be completed
- WHC Contractor Owner (Sub-contractor Approval): must be completed
The next previous version of the current form can be accepted.
IF submitted by a Subcontracting Company: - Sub-contractor Company: must be listed and match registered company in the system
- Primary Contracting Company: must be listed and match a registered company in the system
- Primary Contractor Representative: must be listed
- WHC Contractor Owner Name: must be listed
- Site(s): must be ticked - Click HERE for a list of sites.
- Scope of work: must be completed
- Sub-contractor Management: must be completed
- Primary Contractor Representative (Acknowledgement): must be completed
- WHC Contractor Owner (Sub-contractor Approval): must be completed
The latest version of this form is issue 6.0. The next previous version of the current form can be accepted. | - Issue date to be recorded as Date of document approval by WHC Contractor Owner
- Expiry date must align with the Primary Contracting Company’s WHC-FRM-Contractor Engagement – [SITE] form expiry