Competency | Competency Requirements | Upload |
---|
requirements | Examples |
---|
- The form must be dated and must be signed by the WHC contract owner / coordinator
- Must be signed by relevant WHC manager if trade is being used
Example: Manager Mechanical Engineering or Manager Electrical Engineering - If going underground: Must be signed by manager mining engineering
Saved in the general folder (not the competency tab)
Whitehaven Open Cut:
- Gets uploaded to the generic comp: Safety.Induction.Open Cut and Generic ATUI Form
Whitehaven Underground:
Admin. Letter of competency induction authorisationThe form should be fully completed to be accepted
- The role of the person is listed i.e. Operator / Coal loader. Top of page 2.
- The primary Location must be listed.
- The induction would ideally be listed on the form however if this has been missed in completing the form it can still be accepted
- For sign off:
The contract owner or Contract coordinator always needs to sign.
The mechanical or Electrical is only required if the role is linked to any mechanical or electrical role.
The Manager of Mining engineering needs to sign for ALL underground trades and Operator for Narrabri.
The Manager of Mining engineering needs to sign only for open cut operators.
Safety.Induction.Open Cut and Generic ATUI Form Or Safety. Induction. Underground and Generic ATUI Form Click HERE to access a copy of the form | All 6 pages of the form must be uploaded Only version 16 will be accepted PAGE 1
**PAGE 1 - Additional Requirements
PAGE 2
PAGE 3
PAGES 4, 5 & 6
Form must be no older than 3 months – refer to the latest sign off date in the approvals section. | Pegasus staff CLICK HERE for additional business rule information prior to verification of competency Issue Date - the latest date in the approval section Expiry - 3 years from the issue date | |
Site.Induction.LANDOWNERS SITE ACCESS INDUCTION | Acceptable evidence:
|
|