Whitehaven Coal Contract Coordinator Appointment Form

This business rule was last updated by WHC on 28.03.2018

  • Document must be fully completed and signed by all required WHC personnel in all signature blocks
  • Contracting company details must be displayed on form
  • Contracting company details must match registered company details in Onsite
  • Name of appointee – Contract Coordinator as listed FORM 2 and FORM 1
  • Sites must be listed
  • Expand
    titleAppointment and Nomination Forms

    Anchor
    whcappointmentforms
    whcappointmentforms

    CertificationCertification RequirementsUpload RequirementsExamples

    Whitehaven Coal

    Contract

    Contractor Owner Appointment Form

    This business rule was last updated by WHC on 15.01.2018
    • Document must be fully completed and signed by all required WHC personnel in all signature blocks
    • Contracting company details must be displayed on form
    • Contracting company details must match registered company details in Onsite
    • Name of appointee – Contract Owner as listed on FORM 1
  •  Sites must be listed
  • WHC Contract Coordinator -

    (WHC-FRM-Contractor Owner)


    • Name of Appointee: Contractor Owner as listed on WHC-FRM-Contractor Engagement
    • Name of Contracting Company: Must be listed and match company registered in the system
    • This appointment applies at the following WHC Site(s) / Department(s): Site(s) must be ticked
    • WHC Contractor Owner:must complete name, signature and date.
    Name must match FORM 1.
    • Appointed
    by – signed as per FORM 1
  • Black and white or colour copy is accepted
  • The mine operator or relevant manager must sign the form
  • Whitehaven Coal Contract Owner Appointment Form to be completed and uploaded in Portal and Onsite.
  • Contract Owner is not needed for class A
  • Black and white or colour copy is acceptedWHC Contract Coordinator -
    • By: Sign off must be completed by a Mine Operator or Delegate (Mine Site) or Relevant Manager (Off Site) associated with the relevant site/s ticked as per the Approved Authorisers list

    The latest version of this form is issue 4.0. The next previous version can also be accepted.

    • Issue date to be recorded as Date of document approval by WHC
  • Expiration date as per Whitehaven Coal Contractor Engagement Form 1 - valid for 3 years
  • Image Removed

    • Expiry date must align with the Primary Contracting Company’s WHC-FRM-Contractor Engagement – [SITE] form expiry

    Pegasus staff click here for additional business rule information prior to completing file verification


    Whitehaven Coal Contractor Coordinator Appointment Form (WHC-FRM-Contractor Coordinator)



    • Name of Appointee:Must be a WHC employee
    • Name of Contracting Company:must be listed and match registered company in the system
    • This appointment applies at the following WHC Site(s)/Department(s):Site(s) must be ticked
    • WHC Contract Coordinator: must complete name, signature and date
    . Name must match FORM 1
    • .
    • Appointed
    by – must match FORM 1
  • The mine operator or relevant manager must sign the form
  • Whitehaven Coal Contract Coordinator Appointment Form to be completed and uploaded in Portal and Onsite.
  • Black and white or colour copy is accepted
    • If form 1 is stating several contract coordinators, all forms for contract coordinators should be uploaded in the portal
    • Issue date to be recorded as Date of document approval by WHC
    • Expiration date as per Whitehaven Coal Contractor Engagement Form 1 - valid for 3 years

    Image Removed

    Contractor Company Supervisor Nomination Form

    This business rule was last updated by WHC on 15.01.2018

  • Document must be fully completed and signed in all signature blocks
  • Contracting company details must be displayed on form
  • Contracting company details must match registered company details in Onsite
  • Contract company supervisor – must match FORM 1
  • Site/Area; WHC Contract Owner (Class B & C); WHC Coordinator – must be completed as per site required
  • Approval (Site or Area) must complete name, signature and date. Name must match FORM 1.
  • The mine operator or relevant manager must sign the form
  • Whitehaven Coal Company Supervisor form to be completed and uploaded in Portal and Onsite.
  • Black and white or colour copy is accepted
    • By: WHC Contractor Owner must match the contracting company’s WHC-FRM-Contractor Engagement


    The latest version of this form is issue 8.0. The next previous version can also be accepted.
    • Issue date to be recorded as Date
      of
    • of document
    signature
    • approval by
    contracting companyCertificationCertification RequirementsUpload RequirementsExamples

    Head Contractor Details

    • Contracting company details must be displayed on form
    • Contracting company details must match registered company details in Onsite
    • Head contractor Company details to be displayed
    • Black and white or colour copy is accepted
    • Issue date to be recorded as the date of submission
    • Expiry date to be calculated as 6 months from Issue date
      AnchorsubcontractorformsubcontractorformSubcontractor Details
    • Contracting company details must be displayed on form
    • Contracting company details must match registered company details in Onsite
    • Subcontractor Company details to be displayed
    • Black and white or colour copy is accepted
    • Issue date to be recorded as the date of submission
    • Expiry date to be calculated as 6 months from Issue date
     
    • WHC
  • Expiration date as per Whitehaven Coal Contractor Engagement Form 1 - valid for 3 years
  • Image Removed

    Whitehaven Coal Authority to Undertake Induction
    • Contracting company details must be displayed on form
    • Contracting company details must match registered company details in Onsite
    • Authority to Undertake Induction form to be completed and uploaded
    • Black and white or colour copy is accepted

    NOTE: All people intending to work underground need Gerald Linde or Brian Williams to sign off on the ATUI (form 3) and Form 2

    • MEM - all mechanical trades (Surface and UG) (Richard Hokin)
    • EEM  - all electrical trades (Surface and UG) (Chris Bentham)
    • CHPP, Surface  Civil and Engineering - (Aron Cane)
    • Surface Drilling, Enviro, cultural Heritage and Tech Services - (Owen Salisbury or Dave Ellwood )
    • Safety and Training - (Scott Ginnivan)

    Example:

    If U/G mechanical trade then Gerald or Brian AND Richard Hokin to sign.

    If enviro work then only Owen or Dave to sign

    •  Issue date to be recorded as the date of document approval by WHC
     Image Removed
    Expand
    titleContractor Details
    • Expiry date must align with the Primary Contracting Company’s WHC-FRM-Contractor Engagement – [SITE] form expiry

    Pegasus staff click here for additional business rule information prior to completing file verification




    WHC-FRM-SUB-CONTRACTOR ENGAGEMENT –Form 5

    This business rule was last updated by WHC on 15.01.2018

    • Form(s) can be uploaded separately or as a bundle.
  • 1 form per sub-contractor
  • Expiration date as per Whitehaven Coal ContractorEngagement Form 1 – valid for 3 years

    Whitehaven Coal HSE Document Form 2

    This business rule was last updated by WHC on 24.04.2018

    Business Rule for Version 6.0 of the Whitehaven Coal HSE Document Form 2:

    NOTE: This version of the document is only going to be acceptable until 31/12/2018 - From this date, only Version 7.0 will be acceptable

    • Issue date to be recorded as Date of document approval by WHC
    • Expiration date as per Whitehaven Coal Contractor Engagement Form 1 – valid for 3 years

     

     

     

     

    Image Removed
    Expand
    titleContractor Engagement


    CertificationCertification RequirementsUpload RequirementsExamples

    Anchor
    contractorengagementform1
    contractorengagementform1

    Whitehaven Coal

    WHC-FRM-Contractor Engagement

    Form 1

    This business rule was last updated by WHC on 16.05.2018

  • Contracting company details must be displayed on form
  • Contracting company details must

    – [SITE]




    • Contracting Company: must be listed and match registered company
    details
    • in
    Onsite
    • the system
    • Contractor
    company supervisor box must be completed
  • Site/Area – must be listed as per site required; WHC Contractor Owner (class B & C) – must be listed; WHC Contract Coordinator(s) – must be listed – One contract coordinator per site, the contract owner might or might not be the same for all sites listed
  • Scope of Work section must be listed
  • Contractor Classification must be ticked and must match class in Onsite.
  • Contractor management section all questions completed
  • Notifications to relevant WHC department - optional
  • Approval – must have name printed, must be signed and dated. Must be completed in accordance to the site listed in the field – Site/Area on this form. 
    List of authorised approvers can be found HERE
  • Whitehaven Coal Contractor Engagement Form 1 to be completed and uploaded
  • The latest version of the Form 1 document is issue 5.0
  • Black and white or colour copy is accepted
    • Representative Name: must be listed (not applicable for Class A)
    • WHC Contractor Owner Name: must be listed
    • Site(s): must be ticked. Click HERE for a list of sites;
    • Scope of work: must be completed
    • Classification Result: must be indicated and responses to questions circled
    • Sub-contractors: must be completed
    • WHC HSE Document Review Acknowledgement: if classification is B or C the appropriate box must be indicated (not required for Class A)
    • Contractor Representative (System Acknowledgement): must be completed
    • WHC Contractor Owner (System Approval): must be completed
    • Approvals to Engage Company for NEW FORM (Version 7.0 OR 8.0): A Mine Operator or Delegate (Mine Site) or Relevant Manager (Off Site) associated with each site indicated on page 1 must sign off. These approvers must be on the Approved Authorisers list.
    • List of authorised approvers per site can be found HERE

    The latest version of this form is issue 8.0. The next previous version can also be accepted. 

    • Issue date to be recorded as Date of document approval by WHC
    Expiration to be recorded
    • Mine Operator or Delegate or Relevant Manager
    • Expiry date is 3 years from
    starting date except if stated otherwise in the document.
    Image Removed
    • Primary Contracting company details must be displayed on form
    • Sub- Contracting company details must be displayed on form.
    • Primary Contracting company details must match registered company details in Onsite
    • Primary contactor company -  must be listed with contact details and company to match FORM 1.
    • Sub- contractor company - must be listed with contact details
    • Site/Area; WHC Contract Owner (Class B & C); WHC Coordinator(s)
    • Scope of work completed
    • Approval – Must have name printed, signature and dated. Contract owner must match form 2. 
    • Sub-contractor management – all fields completed
    • Approval (site or area) – WHC contract owner must match FROM 2. Must have name, signature and date.
    • Acknowledgement – Primary contractor company supervisor name must match FORM 1.
    • Form 5 must be fully completed before upload
    • Black and white or colour copy is accepted

    NOTE: Sub-contractors of sub-contractors will be related to the primary contractor.

    NOTE: *When form 5 is uploaded for a sub-contractor and the primary contractor has registered as an uncategorized contractor - send form 5 to site for approval* - Pegasus staff will lookup the primary contractors profile in Onsite then compliance tab and check the type field

    Image Removed
    Expand
    titleHSE Documentation
    Anchor
    hsedocumentationhsedocumentation
    CertificationCertification RequirementsUpload RequirementsExamples
    Business Rule for Version 6.0 of the Whitehaven Coal HSE Document Form 2:
    • Contracting company details must be displayed on form
    • Contracting company details must match registered company details in Onsite
    • Contractor Company Supervisor – listed
    • Site/Area; WHC Contract Owner (class B & C); WHC contract Coordinator – must match details listed on FORM 1
    • WHC Group Standards – OC and/or Narrabri mine section completed. 
    • Other relevant WHC standards or procedures – optional
    • WHC (OC) and/or WHC (NCO) Approvals – must match FORM 1. Must have name printed, signed and dated. 1 Mine operator minimum or relevant manager must sign for his area for OC, U/G need 3 signatures for MME, electrical and mechanical Engineering
      List of authorised approvers can be found HERE
    • Contractor Company Acknowledgement must be completed – the Class must match FORM 1, name needs to be inserted in statement.
    • The class must be selected, to confirm that they agree to classification given
    • Contractor company supervisor – Must have name printed, signature and dated.
    • Approval – Must have name printed, signature and dated.
    • Whitehaven Coal H&C Document Form 2 to be completed and uploaded
    • Black and white or colour copy is accepted

     

    NOTE: All people intending to work underground need Gerald Linde or Brian Williams to sign off on the ATUI (form 3) and Form 2

    • MEM - all mechanical trades (Surface and UG) (Richard Hokin)
    • EEM  - all electrical trades (Surface and UG) (Chris Bentham)
    • CHPP, Surface  Civil and Engineering - (Aron Cane)
    • Surface Drilling, Enviro, cultural Heritage and Tech Services - (Owen Salisbury or Dave Ellwood )
    • Safety and Training - (Scott Ginnivan)

    Example:

    If U/G mechanical trade then Gerald or Brian AND Richard Hokin to sign.

    If enviro work then only Owen or Dave to sign

    Image Removed

     

    Business Rule for Version 7.0 of the Whitehaven Coal HSE Document Form 2:

    • Contract owners and coordinators to be listed for each site,
    • Contract owner to approve form
    • And contracting company to acknowledge their classification and sign form.

    Business Rule for Version 7.0 of the Whitehaven Coal HSE Document Form 2:

    • Issue date to be recorded as Date of document approval by WHC
    • Expiration date as per Whitehaven Coal Contractor Engagement Form 1 – valid for 3 years
    • the date of approval

    Pegasus staff click here for additional business rule information prior to completing file verification

    Anchor
    subcontractorengagementform5
    subcontractorengagementform5
    WHC-FRM-Sub-contractor Engagement - [MAIN / FIRST / SECOND / THIRD / FOURTH / FIFTH /  SIXTH / SEVENTH] - [DIRECT / SUB] - [SITE NAME]



    IF submitted by a Primary Contracting Company:


    • Sub-contractor Company: must be listed and match a registered company in the system
    • Primary Contracting Company: must be listed and match registered company in the system
    • Primary Contractor Representative: must be listed
    • WHC Contractor Owner Name: must be listed
    • Site(s): must be ticked - Click HERE for a list of sites.
    • Scope of work: must be completed
    • Sub-contractor Management: must be completed
    • Primary Contractor Representative (Acknowledgement): must be completed
    • WHC Contractor Owner (Sub-contractor Approval): must be completed

    The next previous version of the current form can be accepted.


    IF submitted by a Subcontracting Company:

    • Sub-contractor Company: must be listed and match registered company in the system
    • Primary Contracting Company: must be listed and match a registered company in the system
    • Primary Contractor Representative: must be listed
    • WHC Contractor Owner Name: must be listed
    • Site(s): must be ticked - Click HERE for a list of sites.
    • Scope of work: must be completed
    • Sub-contractor Management: must be completed
    • Primary Contractor Representative (Acknowledgement): must be completed
    • WHC Contractor Owner (Sub-contractor Approval): must be completed

    The latest version of this form is issue 6.0. The next previous version of the current form can be accepted.

    • Issue date to be recorded as Date of document approval by WHC Contractor Owner
    • Expiry date must align with the Primary Contracting Company’s WHC-FRM-Contractor Engagement – [SITE] form expiry

    Pegasus staff click here for additional business rule information prior to completing file verification



    Expand
    titleHSE Documentation

    Anchor
    hsedocumentation
    hsedocumentation

    WHC-FRM-Contractor HSEManagement Plan Review – (SITE NAME) 
    • Only required for Class C
    • Form is valid for 3 years
    • Contracting Company name much match the name of the company in the system
    • Form to be signed by WHC Contractor Owner, Department Manager and Mining Engineering Manager
    • Issue date to be recorded as date of document approval by WHC Contractor Owner
    • Expiry date to be recorded as 3 years from issue date


    WHC-FRM-Contractor HSE Management Plan Review – Biodiversity Offsets
    • Only required for Class C
    • Form is valid for 3 years
    • Contracting Company name much match the name of the company in the system
    • Form to be signed by WHC Contractor Owner, Department Manager and Mining Engineering Manager
    • Issue date to be recorded as date of document approval by WHC Contractor Owner
    • Expiry date to be recorded as 3 years from issue date