Competency | Competency Requirements | Upload requirements | Examples |
---|---|---|---|
Safety.Induction.Open Cut and Generic ATUI Form Or Safety. Induction. Underground and Generic ATUI Form Click HERE to access a copy of the form | All 6 pages of the form must be uploaded |
Only version 16 will be accepted PAGE 1
|
|
|
|
The contract owner or coordinator needs to be listed, they must sign and date - must be on the approved list:
|
If the contract Owner or Coordinator are not on the approved list, Pegasus must to go to the Contractor Company profile and review the Company Form 1. If the Owner or Coordinator are nominated on the Form 1, the ATUI can be approved. Pegasus staff click here for additional information on performing this check
- The mechanical or electrical is only required if the role is linked to any mechanical or electrical role.
- The Manager of Mining engineering (MME) needs to sign for the role 'All Open Cut - Operator'.
NOTE: Gunnedah CHPP does not have a MME – therefore this signature is not required for applicants that have indicated Gunnedah CHPP as their primary WHC site even if the 'All Open Cut - Operator' role has been chosen.
Page 2
- Inductions; Check list must be completed (Completion not required for re-inductees)
Page 3
- Roles; A role in the Open Cut section must be selected
Page 4, 5 & 6
- Complete if applicable
Only version 12 & 13 will be accepted.
Form must be no older than 3 months - refer to date signed by contract owner or coordinator
Issue Date - the later date listed in the approval section
Expiry - 3 years from the issue date
Click HERE to access a copy of the form
Click HERE to access the authorised approvers list
All 6 pages of the form must be uploaded
Page 1
- Name of inductee must match registering person
- Position must be completed
- Contractor Company must be completed
- WHC Contract Owner or Coordinator email – NOT MANDATORY
- Must select Primary WHC site and all sections must be completed.
- Induction(s) required – must be completed
- Approval section:
The contract owner or coordinator needs to be listed, they must sign and date - must be on the approved list.
If the contract Owner or Coordinator are not on the approved list, Pegasus must to go to the Contractor Company profile and review the Company Form 1. If the Owner or Coordinator are nominated on the Form 1, the ATUI can be approved.
The mechanical or electrical is only required if the role is linked to any mechanical or electrical role.The Manager of Mining engineering
**PAGE 1 - Additional Requirements
|
|
|
|
Page 2
- Inductions; Check list must be completed (Completion not required for re-inductees)
Page 3
- Roles; A role in the Underground section must be selected
PAGE 2
PAGE 3
PAGES 4, 5 & 6
|
Form must be no older than 3 months |
– refer to |
the latest sign off date in the approvals section. | Pegasus staff CLICK HERE for additional business rule information prior to verification of competency Issue Date - the |
latest date |
in the approval section Expiry - 3 years from the issue date |
Site.Induction.LANDOWNERS SITE ACCESS INDUCTION | Acceptable evidence:
|
|