Competency | Competency Requirements | Upload requirements | Examples |
---|
Safety.Induction.Open Cut and Generic ATUI Form Or Safety. Induction. Underground and Generic ATUI Form
Click HERE to access a copy of the form |
This business rule was last updated by WHC on 10.07.2020
| All 6 pages of the form must be uploaded |
Page Page Only version 16 will be accepted PAGE 1 - Name to match registering person
- Position must be completed
- Contractor Company must be completed
- Must select Primary WHC site
- Induction(s) required – must be completed
|
Page 3
Roles; A role in the Open Cut section must be selected
Page 4, 5 & 6
Complete if applicable
Only version 12 & 13 will be accepted.
Form must be no older than 3 months - refer to date signed by contract owner or coordinator
Issue Date - the later date listed in the approval section Expiry - 3 years from the issue date | Image Removed
Image Removed
Safety.Induction.Underground and Generic ATUI Form
This business rule was last updated by WHC on 10.07.2020
Click HERE to access a copy of the form
All 6 pages of the form must be uploaded
Page 1
- Name of inductee must match registering person
- Position must be completed
- Contractor Company must be completed
- WHC Contract Owner or Coordinator email – NOT MANDATORY
- Must select Primary WHC site and all sections must be completed.
- Induction(s) required – must be completed
Page 3
Roles; A role in the Underground section must be selected
**PAGE 1 - Additional Requirements - For Trades roles (any roles including ‘Tradesperson’ in the name): The ATUI must include sign off by a person on the authorised approvers list relevant to the role and site. Eg. Electrical roles to be signed by Manager Electrical Engineering, Mechanical Tradesperson roles to be signed off by Mechanical Engineering Manager with the exception of All Open Cut – Other Tradesperson, which can be signed by either the Electrical or Mechanical Engineering Manager relevant to the site.
- All Open Cut – Operator (must be signed off by the Manager of Mining Engineering (MME) or Fixed Plant and CHPP Manager
- Narrabri - The Manager of Mining Engineering (MME) needs to sign for ALL underground trades and Operator roles.
- Narrabri - MME sign off not needed for surface role at Narrabri OR for re-inductees
PAGE 2
- Can be completed at contracting company's leisure; used as reference rather than requirement
PAGE 3 - Roles that have been selected on the form must match exactly to the portal
- Roles - Where Narrabri Surface (or Underground) is selected as the primary site on page 1 a Narrabri Surface (or Underground)role must be selected.
PAGES 4, 5 & 6 |
Only version 12 & 13 will be accepted. Form must be no older than 3 months |
- date signed by contract owner or coordinatorthe latest sign off date in the approvals section.
| Pegasus staff CLICK HERE for additional business rule information prior to verification of competency Issue Date - the |
later listed in the approval section Expiry - 3 years from the issue date |
|
Site.Induction.LANDOWNERS SITE ACCESS INDUCTION | Acceptable evidence: - Must be a Statement of completion - PACS - PROPERTY ACCESS INDUCTION
- Must show completion of Winchester Downs Property Access Induction
- Name to match the person registered.
| - Issue Date: as per the issue date identified on the Statement of completion.
- Expiry Date: two (2) years after the issue date
|
Image Removed- identified on the statement of completion.
| |