Multiple Peabody Sites
Competency | Competency Requirements | Upload Requirements | Examples |
---|
Site.Induction.QLD OC - Online Training - PEA Core Induction Certificate | - Must be the "Peabody Open Cut Core Induction - Core Modules" used across the Burton, Coppabella and Moorvale platforms.
| - Issue Date: The completion date identified on the certificate
- Expiry Date: Five (5) years after the issue date.
| |
Coppabella
Competency | Competency Requirements | Upload Requirements | Examples |
---|
Site.Induction.Coppabella - Induction Approval Form | | - Issue date to be recorded - Date of manager signature
- 5 years from date of manager signature
- Must be clearly scanned and legible
| |
Site.Induction.CB - Online Training - All Coal Mine Workers Certificate | - Must be the previously site specific "All Coal Mine Worker Induction" used at Coppabella
| - Issue Date: The completion date identified on the certificate
- Expiry Date: Five (5) years after the issue date.
| |
Site.Induction.CB - Online Training - Site Specific Awareness Certificate | - Must be the "Peabody Opencut Core Induction - Coppabella Site SOPs" or the previously site specific role packages used at Coppabella
| - Issue Date: The completion date identified on the certificate
- Expiry Date: Five (5) years after the issue date.
| |
Metropolitan
Competency | Competency Requirements | Upload Requirements | Examples |
---|
Induction Approval Form | | - Duration = 24 months
- Issue Date = date signed
- Expiry Date = as per duration unless stipulated
| |
Coal Services - Generic Underground Induction | - Name to match
- Issued within the last 12 months
- Issued by Coal Service Mines Rescue only
- All 7 of the following must be listed:-
- RIICOM201D Communicate in the workplace
- RIIERR203D Escape from hazardous situation unaided
- RIIEII205D apply initial response first aid
- RIIERR302D Respond to local emergencies and incidents
- RIIGOV201D Comply with site work processes/procedures
- RIIRIS201D Conduct local risk control
- RIIWHS201D Work safely and follow WHS policies and procedures.
| - Duration = 5 years
- Issue Date = date issued
- Expiry Date = as per duration unless stipulated
| |
Generic Induction (Surface) | - Name to match
- Issued by Peabody within the last 24 months
| - Duration = 24 months
- Issue Date = date signed
- Expiry Date = as per duration unless stipulated
| |
Underground Induction | - Name to match
- Issued by Peabody within the last 24 months
| - Duration = 24 months
- Issue Date = date signed
- Expiry Date = as per duration unless stipulated
| |
Egress Induction | - Name to match
- Issued by Peabody within the last 12 months
| - Duration = 12 months
- Issue Date = date signed
- Expiry Date = as per duration unless stipulated
| |
Millennium
Competency | Competency Requirements | Upload Requirements | Examples |
---|
Site.Induction.Millennium - Induction Booking Form | - Name must match person registered
- Induction date to be listed on document
- Induction title / purpose to be listed on document
| - Issue date to be recorded
- Check the 3 authorisation sections have been signed off
| |
Moorvale
Competency | Competency Requirements | Upload Requirements | Examples |
---|
Site.Induction.Moorvale Induction Approval Form | | - Issue date to be recorded
| |
Site.Induction.MV - Online Training - Site Specific Awareness Certificates | - Must be the "Peabody Opencut Core Induction - Moorvale Site SOP'
| - Issue Date: The completion date identified on the certificate
- Expiry Date: Five (5) years after the issue date.
| |
Wambo
Competency | Competency Requirements | Upload Requirements | Example |
---|
Induction Approval Form | - Name must match person registered
- Issue date to be recorded
- Check the 2 authorisation sections have been signed off – requester and 1 of either Wambo job coordinator or department manager
| | |
Wilpinjong
Competency | Competency Requirements | Upload Requirements | Example |
---|
Induction Approval Form | - Induction Request form signed by one of the following site contacts – it is the contracting companies responsibility to get the form signed – do not approve booking without signed approval
- List of Authorisers:
- David Mealing Maintenance Manager
- Carl Booy Maintenance Superintendent in David’s absence
- Richard Cade CHPP Manager
- Mark Collins CHPP Superintendent in Richard’s Absence
- Peter Grosvenor Manager of Mining Engineering. (Mine Manager/Production Manager)
- Sean Mumford Mining Superintendent in Peter’s Absence
- Janiene Hoch (HST Manager)
- Simone Riley HST assistant in HST Manager's absence
- Nicholas Collings Technical Services Manager.
- Roger Biddle Technical Services Superintendent in Nick’s absence.
- Blair Jackson site General Manager.
- Peter Schmidt Continuous Improvement Manager
- Lisa Andrews Commercial Manager
- Kieren Bennetts Environmental Manager.
- Ian Flood Projects Approvals Manager.
- Stacey Arnold HR Superintendent.
- Marvick Cuschieri
- Jamie Gallen
- Paul Grimes - Warehouse Supervisor
- Carl Booy - PCR Supervisor
- Mark Bampton - Drill & Blast Supervisor
- Jeanette Bierbaum
| | |