Competency | Competency Requirements | Upload Requirements | Examples |
---|
Site - Pre-Approval form / Authority to undertake induction form | - The form must be dated and must be signed by the WHC contract owner / coordinator
- Must be signed by relevant WHC manager if trade is being used
Example: Manager Mechanical Engineering or Manager Electrical Engineering - If going underground: Must be signed by manager mining engineering
- All pages of the form must be included within the uploaded file
Note: The Whitehaven Coal Induction Information Form issued by Pegasus is not an acceptable form for this competency upload | Saved in the general folder (not the competency tab) Whitehaven Open Cut: - Gets uploaded to the generic comp: Safety.Induction.Open Cut and Generic ATUI Form
Whitehaven Underground: - Admin. Letter of competency induction authorisation
|
|
Access keys to be assigned: Check the Authority to Undertake Induction form. For each site selected they should have an access key. | |
Competency | Competency Requirements | Upload requirements | Examples |
---|
Safety.Induction.Open Cut and Generic ATUI Form | Click HERE to access a copy of the form
- The Manager of Mining engineering needs to sign only for open cut operators.
NOTE: The CHPP does not have a MME – therefore this signature is not required.
Only version 8 ,9 and 10 will be accepted. Note: The Whitehaven Coal Induction Information Form issued by Pegasus is not an acceptable form for this competency upload | |
|