- Created by Anika McEvoy, last modified by Gracielle Molino on Aug 19, 2024
You are viewing an old version of this page. View the current version.
Compare with Current View Page History
« Previous Version 59 Next »
Competency Name | Competency Requirements | Upload Requirements | Examples |
---|---|---|---|
Boilermaker.Trade.Qualification - Boilermaker |
|
| |
Welder.Certificate.Welding Supervisor |
|
| |
Welder.-.WTIA Licence - AS2214 Welding Supervisor |
|
| |
Welder.Course.Certified Welding Inspector |
|
| |
Welder.Trade.Qualification - Welding (First Class) |
|
| |
Welder.Industry Skilled Welder Coded | INDUSTRY SKILLED - Traceable experience as a CODED WELDER for at least 3 years (verified by fully completed SITE AUTHORISATION – RELEVANT EXPERIENCE EVIDENCE supported with written evidence - resume and referee, responsibility of the employer) PLUS MUST HAVE Tested and certified to ASME Section IX, coded welders (including boiler tube welders) are tested and then re-validated 6 monthly by a certified Cert. 10 welding supervisor, also must be experienced in boiler tube welding – see example ie ASME Section IX EXAMPLE INDUSTRY SKILLED BUSINESS RULE -see below BOTH 1 & 2 below ARE MANDATED REQUIREMENTS of the role and need to be uploaded into AVETTA as one document for this role: 1. A copy of the required Site Authorisation – Relevant Experience Evidence Form can be downloaded here
The supplier company will be required to reach out to their site contact directly providing the above form (with contractor to complete section completed) + evidence of at least 3 years relevant experience for their review. PLUS 2. MUST HAVE tested and certified to ASME Section IX. Coded welders are tested and then re-validated 6 monthly by a certified Cert. 10 welding supervisor, also must be experienced in boiler tube welding – see example of certification required.
BOTH 1 & 2 MUST BE UPLOADED IN AS ONE CONTINUOUS DOCUMENT. NOTE: INDUSTRY SKILLED WELDER CODED ROLE WILL EXPIRE AFTER 6 MONTHS OF COMPLETION OF ASME IX TEST IF NOT RENEWED. | ASME Issue Date to be recorded : The latest date of sign-off in the client approval table of the form | ASME example: |
Welder.–Industry Skilled Boiler Tube | INDUSTRY SKILLED – Traceable experience as a BOILER TUBE WELDER for at least 3 years (verified by written evidence – resume and referee, responsibility of the employer) PLUS MUST HAVE Tested and certified to ASME IX. Boiler tube welders are tested and then re-validated 6 monthly by a certified Cert. 10 welding supervisor – see example of certification required. BOTH 1 & 2 below ARE MANDATED REQUIREMENTS of the role and need to be uploaded into AVETTA as one document for this role: 1. A copy of the required Site Authorisation – Relevant Experience Evidence Form can be downloaded here
The supplier company will be required to reach out to their site contact directly providing the above form (with contractor to complete section completed) + evidence of at least 3 years relevant experience for their review. PLUS 2. MUST HAVE tested and certified to ASME Section IX. Boiler Tube welders are tested and then re-validated 6 monthly by a certified Cert. 10 welding supervisor – see example of certification required.
BOTH 1 & 2 MUST BE UPLOADED IN AS ONE CONTINUOUS DOCUMENT. NOTE: INDUSTRY SKILLED WELDER CODED ROLE WILL EXPIRE AFTER 6 MONTHS OF COMPLETION OF ASME IX TEST IF NOT RENEWED. | ASME Issue Date to be recorded : The latest date of sign-off in the client approval table of the form | |
Certificate.Accreditation.Ultrasonic Impact Treatment accreditation |
|
| |
Site.-.NDT; AINDT or PCN Accreditation Level 1 |
|
| |
Site.-.NDT; AINDT or PCN Accreditation Level 2 |
|
| |
Site.-.NDT; AINDT or PCN Accreditation Level 3 |
|
|
Competency Name | Competency Requirements | Upload Requirements | Examples |
---|---|---|---|
Welder.-.RTAY Welding General - THEORY; 31415698 |
Shortened versions of first names are accepted, such as: Shortened versions of last names are accepted, such as:
NOTE:
| Issue date = If a certificate has been provided, use the course completion date as issue date. If Theory Assessment or Site Authorisation, use the assessor's signature date. Expiry date = 99 years from issue date | |
Welder.-.RTAY Welding General Purpose GMAW; 31260273 |
Shortened versions of first names are accepted, such as: Shortened versions of last names are accepted, such as:
NOTE:
| Issue date = If a certificate has been provided, use the course completion date as issue date. If Theory Assessment or Site Authorisation, use the assessor's signature date. Expiry date = 2 years from issue date | |
Welder.-.RTAY Welding General Purpose GTAW; 31260274 | |||
Welder.-.RTAY Welding General Purpose MMAW; 31108073 | |||
Welder.-.RTAY Welding Pressure Welding FCAW; 31260276 | |||
Welder.-.RTAY Welding Pressure Welding GMAW; 31260275 | |||
Welder.-.RTAY Welding Pressure Welding MMAW; 31108226 | |||
RTAY Welding Pressure Welding GTAW 31279701 | |||
Welder.-.RTAY Welding Structural FCAW; 31260553 | |||
Welder.-.RTAY Welding Structural GMAW; 31260552 | |||
Welder.-.RTAY Welding Structural MMAW; 31108075 | |||
Site.-.RTAY EI Radiation NDT Coordinator | Rule to be confirmed by client | ||
Site.-.RTAY NDT Test Plate Proficiency Level 1 |
Shortened versions of first names are accepted, such as: Shortened versions of last names are accepted, such as:
NOTE:
| Issue date = If a certificate has been provided, use the course completion date as issue date. If Theory Assessment or Site Authorisation, use the assessor's signature date. Expiry date = 50 years from issue date | |
Site.-.RTAY NDT Test Plate Proficiency Level 2 |
Shortened versions of first names are accepted, such as: Shortened versions of last names are accepted, such as:
NOTE:
| Issue date = If a certificate has been provided, use the course completion date as issue date. If Theory Assessment or Site Authorisation, use the assessor's signature date. Expiry date = 50 years from issue date | |
Site.-.RTAY NDT Magnetic Particule Testing (MT) Level 1 |
Shortened versions of first names are accepted, such as: Shortened versions of last names are accepted, such as:
NOTE:
| Issue date = use the assessor's signature date. Expiry date = 50 years from issue date | |
Site.-.RTAY NDT Magnetic Particule Testing (MT) Level 2 |
Shortened versions of first names are accepted, such as: Shortened versions of last names are accepted, such as:
NOTE: The learning and development section of the form does not need to be completed | Issue date = use the assessor's signature date. Expiry date = 50 years from issue date | |
Site.-.RTAY NDT Penetrant Testing (PT) Level 1 |
Shortened versions of first names are accepted, such as: Shortened versions of last names are accepted, such as:
NOTE: The learning and development section of the form does not need to be completed | Issue date = use the assessor's signature date. Expiry date = 50 years from issue date | |
Site.-.RTAY NDT Penetrant Testing (PT) Level 2 |
Shortened versions of first names are accepted, such as: Shortened versions of last names are accepted, such as:
NOTE: The learning and development section of the form does not need to be completed | Issue date = use the assessor's signature date. Expiry date = 50 years from issue date | |
Site.-.RTAY NDT Ultrasonic Testing (UT) Level 2 |
Shortened versions of first names are accepted, such as: Shortened versions of last names are accepted, such as:
NOTE: The learning and development section of the form does not need to be completed | Issue date = use the assessor's signature date. Expiry date = 50 years from issue date | |
Site.-.RTAY NDT Ultrasonics Thickness Testing (UTT) Level 1 |
Shortened versions of first names are accepted, such as: Shortened versions of last names are accepted, such as:
NOTE: The learning and development section of the form does not need to be completed | Issue date = use the assessor's signature date. Expiry date = 50 years from issue date |
- No labels