Competency | Competency Requirements | Upload requirements | Examples |
---|
Safety.Induction.Open Cut and Generic ATUI Form | Click HERE to access a copy of the form Click HERE to access the authorised approvers list All 6 pages of the form must be uploaded Page 1 - Name of inductee must match registering person
- Position must be completed
- Contractor Company must be completed
- WHC Contract Owner or Coordinator email – NOT MANDATORY
- Must select Primary WHC site and all sections must be completed.
- Induction(s) required – must be completed
- Approval section:
The contract owner or coordinator needs to be listed, they must sign and date - must be on the approved list. If the name is not on the list, Pegasus to check Contractor Company profile and Owner or Coordinator nominated to establish a name match. Pegasus to escalate to site if match cannot be confirmed. The mechanical or electrical is only required if the role is linked to any mechanical or electrical role. - The Manager of Mining engineering (MME) needs to sign for the role 'All Open Cut - Operator'.
NOTE: Gunnedah CHPP does not have a MME – therefore this signature is not required for applicants that have indicated Gunnedah CHPP as their primary WHC site even if the 'All Open Cut - Operator' role has been chosen. Page 2 - Inductions; Check list must be completed (Completion not required for re-inductees)
Page 3 - Roles; A role in the Open Cut section must be selected
Page 4, 5 & 6 Only version 12 & 13 will be accepted. Form must be no older than 3 months - refer to date signed by contract owner or coordinator | |
|
Safety.Induction.Underground and Generic ATUI Form | Click HERE to access a copy of the form Click HERE to access the authorised approvers list All 6 pages of the form must be uploaded Page 1 - Name of inductee must match registering person
- Position must be completed
- Contractor Company must be completed
- WHC Contract Owner or Coordinator email – NOT MANDATORY
- Must select Primary WHC site and all sections must be completed.
- Induction(s) required – must be completed
- Approval section:
The contract owner or coordinator needs to be listed, they must sign and date - must be on the approved list. If the name is not on the list, Pegasus to check Contractor Company profile and Owner or Coordinator nominated to establish a name match. Pegasus to escalate to site if match cannot be confirmed. The mechanical or electrical is only required if the role is linked to any mechanical or electrical role. The Manager of Mining engineering (MME) needs to sign for ALL underground trades and Operator for Narrabri.
NOTE: MME sign off not needed for surface role at Narrabri Page 2 - Inductions; Check list must be completed (Completion not required for re-inductees)
Page 3 - Roles; A role in the Underground section must be selected
Page 4, 5 & 6 Only version 12 & 13 will be accepted. Form must be no older than 3 months - refer to date signed by contract owner or coordinator | | |
Tradesperson.-.Training Plan Assessment GROUP Electrical.Assessment.WHC-FRM-OC-Training Plan Electrical Apprentice Electrical.Assessment.WHC-FRM-OC-Training Plan Electrical Engineer Electrical.Assessment.WHC-FRM-OC-Training Plan Electrical Supervisor Leading Hand Electrical.Assessment.WHC-FRM-OC-Training Plan Electrical Technician Electrical.Assessment.WHC-FRM-OC-Training Plan Electrical Tradesperson for Electrical Drive Equipment Electrical.Assessment.WHC-FRM-OC-Training Plan Electrical Tradesperson Electrical.Assessment.WHC-FRM-OC-Training Plan High Voltage Operator Electrical.Assessment.WHC-FRM-OC-Training Plan Infrequent Electrical Worker Mechanical.Assessment.WHC-FRM-OC-Training Plan Mechanical Apprentice Mechanical.Assessment.WHC-FRM-OC-Training Plan Mechanical Engineer Mechanical.Assessment.WHC-FRM-OC-Training Plan Mechanical Supervisors and Leading Hands Mechanical.Assessment.WHC-FRM-OC-Training Plan Mechanical Tradesperson Mechanical.Assessment.WHC-FRM-OC-Training Plan Mechanical Worker Mechanical.Assessment.WHC-FRM-OC-Training Plan Specialist Mechanical Worker Mechanical.Assessment.WHC-FRM-OC-Training Plan Statutory Mechanical Engineer | - Name of inductee must match registering person
- The competency selected must match the name of the training plan
- The inductee must also be booked to attend the Generic induction on the same day as the Open Cut Trade -Training Plan Assessment Induction. Pegasus to review training dates
| | |