Document | Document Requirements | Upload Requirements | Examples |
---|
Quick Hitch Compliance Documentation | NOTE: Hitch certification details to be stored with plant item. - Asset details to be displayed on evidence (Type and Model)
- Evidence must be uploaded for Excavators fitted with Quick Hitches
- Evidence needs to verify Fully Auto Hitch
| - Issue/inspection Date = Record this as it is listed on the uploaded evidence
- Expiry Date = None
| |
Current Lifting Equipment Register | NOTE: Lifting Equipment Register to be available with Plant Item performing lifting tasks. | - Issue/inspection Date = Record this as it is listed on the certificate
- Expiry Date = Record this as issue date + 12 months.
| Image Added |
Monthly Pipeline Thickness Report | NOTE: Reports need to be stored with the pump
- Must be recorded in readable / understandable format that ties in with plant item.
- Single wall pipes to have thickness tests available
- Twin wall pipes cannot be thickness tested so volume of concrete pumped through them must be recorded with upper limits detailed.
- Twin wall pipes to have volumes recorded.
| - Issue/inspection Date = Record this as it is listed in the logbook
- Expiry Date = One off upload. Doesn’t expire
| |
Crane Safe Green Sticker Inspection | NOTE: Crane Safe Sticker to be located on Plant Item. - Asset details to be displayed on evidence (Type and Model)
- Must be CraneSafe certificate
- Owner name on certificate to match the company owning the asset.
- Duration as per expiry on certificate
- Black and white or colour (green) acceptable
- Only front of certificate needs to be shown when certificate is uploaded.
| - Issue/inspection Date = Record this as it is listed on the certificate
- Expiry Date = Record this as it is listed on the certificate
| |
Pile Safe Green Sticker Inspection | NOTE: Pile Safe Sticker to be located on Plant Item. - Asset details to be displayed on evidence (Type and Model)
- Must be Pile Safe certificate
- Owner name on certificate to match the company owning the asset.
- Duration as per expiry on certificate
- Black and white or colour (green) acceptable
- Only front of certificate needs to be shown when certificate is uploaded.
| - Issue/inspection Date = Record this as it is listed on the certificate
- Expiry Date = Record this as it is listed on the certificate
| |
Annual Inspection | NOTE: Inspection record to be stored with plant item.
- Asset details to be displayed on evidence (Type and Model)
- Must be completed by a competent person:
- Professional engineer
- NDT technician
- Qualified tradesman
- Date of inspection at least 1 year from the date the asset was first commissioned/ registered or reregistered whichever was first.
- No non-compliances
| - Issue/inspection Date = Record this as it is listed in the log book
- Expiry Date = 12 months from last annual inspection record.
| |
10 Year Major Inspection (Cranes & EWP's) | NOTE: Inspection record to be stored with plant item. - Asset details to be displayed on evidence (Type and Model)
- Must be completed by a competent person:
- Professional engineer
- NDT technician
- Qualified tradesman
- Date of inspection at least 10 years from the date the asset was first commissioned/ registered or reregistered whichever was first.
- No non-compliances.
- Cranes not to be older than 20 years
| - Issue/inspection Date = Record this as it is listed on the recertification
- Expiry Date = recertification date + 10 years
| |
6 Year Major Inspection (Concrete Pumps) | NOTE: Inspection record to be stored with plant item. - Asset details to be displayed on evidence (Type and Model)
- Must be completed by a competent person:
- Professional engineer
- NDT technician
- Qualified tradesman
- Date of inspection at least 6 years from the date the asset was first commissioned/ registered or reregistered whichever was first.
- No non-compliances
| - Issue/inspection Date = Record this as it is listed on the recertification
- Expiry Date = recertification date + 6 years
| |