Skip to end of metadata
Go to start of metadata
You are viewing an old version of this page. View the current version.
Compare with Current
View Page History
« Previous
Version 53
Next »
Competency | Competency Requirements | Upload requirements | Examples |
---|
Safety.Induction.Open Cut and Generic ATUI Form Or Safety. Induction. Underground and Generic ATUI Form
Click HERE to access a copy of the form
This business rule was last updated by WHC on 23.07.2020 | All 6 pages of the form must be uploaded Page 1 - Name to match registering person
- Position must be completed
- Contractor Company must be completed
- Must select Primary WHC site
- Induction(s) required – must be completed
- Approval section: must be signed
Additional Requirements - for Tradesperson roles (any roles including ‘Tradesperson’ in the name): Must include sign off by a person on the authorised approvers list relevant to the role and site. Eg. Electrical Tradesperson to be signed by Manager Electrical Engineering, all other Tradesperson roles to be signed off by Mechanical Engineering Manager
- All Open Cut – Operator must be signed off by the Manager of Mining Engineering (MME) or Fixed Plant and CHPP Manager
- Narrabri - The Manager of Mining Engineering (MME) needs to sign for ALL underground trades and Operator roles.
- Narrabri - MME sign off not needed for surface role at Narrabri OR for re-inductees
Click here to access the authorised approvers list for roles other then contractor owner / coordinator. Page 3 - Roles - Where Narrabri is selected as the primary site on page 1 a Narrabri role must be selected.
Page 4, 5 & 6 Form must be no older than 3 months - refer to the latest sign-off date in the approvals section. Only version 12 & 13 will be accepted. | Issue Date - the latest date in the approval section Expiry - 3 years from the issue date | Open Cut & Generic
Underground |
Safety.Induction.Underground and Generic ATUI Form
This business rule was last updated by WHC on 31.03.2020 | Click HERE to access a copy of the form Click HERE to access the authorised approvers list All 6 pages of the form must be uploaded Page 1 - Name of inductee must match registering person
- Position must be completed
- Contractor Company must be completed
- WHC Contract Owner or Coordinator email – NOT MANDATORY
- Must select Primary WHC site and all sections must be completed.
- Induction(s) required – must be completed
- Approval section: must at minimum be signed by a contract owner / coordinator
- In addition, tradesperson roles must be signed off by a person on the authorised approvers list relevant to the role e.g. Electrical Tradesperson signed by Manager Electrical Electrical Engineering.
Click here to access the authorised approvers list for roles other then contractor owner / coordinator. The Manager of Mining Engineering (MME) or CHPP Manager need to sign for the role 'All Open Cut - Operator'. Page 3 Roles: a role in the Open Cut section must be selected Page 4, 5 & 6 Complete if applicable Only version 12 & 13 will be accepted. Form must be no older than 3 months - refer to the latest sign off date in the approvals section.
|
| |