Rail Business Rules | Generic | John Holland
- Anika McEvoy
- riotintoaustralia (Unlicensed)
- kate Asquith (Unlicensed)
Competency | Competency Requirements | Upload Requirements | Examples |
---|---|---|---|
Design Infrastructure.Assessment.John Holland - Buildings/Stations - Design Verifier/Approver |
NOTE: The uploaded document for this competency is expected to be verified by the relevant assessor / subject matter expert rather than a Pegasus processing team member. This document will correctly go through as 'pending' and ready for verification to the relevant assessor when the applicant has completed all mandatory uploads (exclusive of Statement of Competency upload) and then uses the 'Apply for assessment' option (against the statement of competency file section) to submit the entire application through to a nominated assessor. | The assessor of this file (and role) will enter any required issue or expiration dates when verifying the file. | |
Design Infrastructure.Assessment.John Holland - Buildings/Stations - Designer |
NOTE: The uploaded document for this competency is expected to be verified by the relevant assessor / subject matter expert rather than a Pegasus processing team member. This document will correctly go through as 'pending' and ready for verification to the relevant assessor when the applicant has completed all mandatory uploads (exclusive of Statement of Competency upload) and then uses the 'Apply for assessment' option (against the statement of competency file section) to submit the entire application through to a nominated assessor. | The assessor of this file (and role) will enter any required issue or expiration dates when verifying the file. | |
Design Infrastructure.Assessment.John Holland - Civil/Geotech - Design Verifier/Approver |
NOTE: The uploaded document for this competency is expected to be verified by the relevant assessor / subject matter expert rather than a Pegasus processing team member. This document will correctly go through as 'pending' and ready for verification to the relevant assessor when the applicant has completed all mandatory uploads (exclusive of Statement of Competency upload) and then uses the 'Apply for assessment' option (against the statement of competency file section) to submit the entire application through to a nominated assessor. | The assessor of this file (and role) will enter any required issue or expiration dates when verifying the file. | |
Design Infrastructure.Assessment.John Holland - Civil/Geotech - Designer |
NOTE: The uploaded document for this competency is expected to be verified by the relevant assessor / subject matter expert rather than a Pegasus processing team member. This document will correctly go through as 'pending' and ready for verification to the relevant assessor when the applicant has completed all mandatory uploads (exclusive of Statement of Competency upload) and then uses the 'Apply for assessment' option (against the statement of competency file section) to submit the entire application through to a nominated assessor. | The assessor of this file (and role) will enter any required issue or expiration dates when verifying the file. | |
Design Infrastructure.Assessment.John Holland - Communications - Design Verifier/Approver |
NOTE: The uploaded document for this competency is expected to be verified by the relevant assessor / subject matter expert rather than a Pegasus processing team member. This document will correctly go through as 'pending' and ready for verification to the relevant assessor when the applicant has completed all mandatory uploads (exclusive of Statement of Competency upload) and then uses the 'Apply for assessment' option (against the statement of competency file section) to submit the entire application through to a nominated assessor. | The assessor of this file (and role) will enter any required issue or expiration dates when verifying the file. | |
Design Infrastructure.Assessment.John Holland - Communications - Designer |
NOTE: The uploaded document for this competency is expected to be verified by the relevant assessor / subject matter expert rather than a Pegasus processing team member. This document will correctly go through as 'pending' and ready for verification to the relevant assessor when the applicant has completed all mandatory uploads (exclusive of Statement of Competency upload) and then uses the 'Apply for assessment' option (against the statement of competency file section) to submit the entire application through to a nominated assessor. | The assessor of this file (and role) will enter any required issue or expiration dates when verifying the file. | |
Design Infrastructure.Assessment.John Holland - Electrical Design - Design Verifier/Approver |
NOTE: The uploaded document for this competency is expected to be verified by the relevant assessor / subject matter expert rather than a Pegasus processing team member. This document will correctly go through as 'pending' and ready for verification to the relevant assessor when the applicant has completed all mandatory uploads (exclusive of Statement of Competency upload) and then uses the 'Apply for assessment' option (against the statement of competency file section) to submit the entire application through to a nominated assessor. | The assessor of this file (and role) will enter any required issue or expiration dates when verifying the file. | |
Design Infrastructure.Assessment.John Holland - Electrical Design - Designer |
NOTE: The uploaded document for this competency is expected to be verified by the relevant assessor / subject matter expert rather than a Pegasus processing team member. This document will correctly go through as 'pending' and ready for verification to the relevant assessor when the applicant has completed all mandatory uploads (exclusive of Statement of Competency upload) and then uses the 'Apply for assessment' option (against the statement of competency file section) to submit the entire application through to a nominated assessor. | The assessor of this file (and role) will enter any required issue or expiration dates when verifying the file. | |
Design Infrastructure.Assessment.John Holland - OHW - Design Verifier/Approver |
NOTE: The uploaded document for this competency is expected to be verified by the relevant assessor / subject matter expert rather than a Pegasus processing team member. This document will correctly go through as 'pending' and ready for verification to the relevant assessor when the applicant has completed all mandatory uploads (exclusive of Statement of Competency upload) and then uses the 'Apply for assessment' option (against the statement of competency file section) to submit the entire application through to a nominated assessor. | The assessor of this file (and role) will enter any required issue or expiration dates when verifying the file. | |
Design Infrastructure.Assessment.John Holland - OHW - Designer |
NOTE: The uploaded document for this competency is expected to be verified by the relevant assessor / subject matter expert rather than a Pegasus processing team member. This document will correctly go through as 'pending' and ready for verification to the relevant assessor when the applicant has completed all mandatory uploads (exclusive of Statement of Competency upload) and then uses the 'Apply for assessment' option (against the statement of competency file section) to submit the entire application through to a nominated assessor. | The assessor of this file (and role) will enter any required issue or expiration dates when verifying the file. | |
Design Infrastructure.Assessment.John Holland - Rolling Stock - Design Verifier/Approver |
NOTE: The uploaded document for this competency is expected to be verified by the relevant assessor / subject matter expert rather than a Pegasus processing team member. This document will correctly go through as 'pending' and ready for verification to the relevant assessor when the applicant has completed all mandatory uploads (exclusive of Statement of Competency upload) and then uses the 'Apply for assessment' option (against the statement of competency file section) to submit the entire application through to a nominated assessor. | The assessor of this file (and role) will enter any required issue or expiration dates when verifying the file. | |
Design Infrastructure.Assessment.John Holland - Rolling Stock - Designer |
NOTE: The uploaded document for this competency is expected to be verified by the relevant assessor / subject matter expert rather than a Pegasus processing team member. This document will correctly go through as 'pending' and ready for verification to the relevant assessor when the applicant has completed all mandatory uploads (exclusive of Statement of Competency upload) and then uses the 'Apply for assessment' option (against the statement of competency file section) to submit the entire application through to a nominated assessor. | The assessor of this file (and role) will enter any required issue or expiration dates when verifying the file. | |
Design Infrastructure.Assessment.John Holland - Signals Design - Design Verifier/Approver |
NOTE: The uploaded document for this competency is expected to be verified by the relevant assessor / subject matter expert rather than a Pegasus processing team member. This document will correctly go through as 'pending' and ready for verification to the relevant assessor when the applicant has completed all mandatory uploads (exclusive of Statement of Competency upload) and then uses the 'Apply for assessment' option (against the statement of competency file section) to submit the entire application through to a nominated assessor. | The assessor of this file (and role) will enter any required issue or expiration dates when verifying the file. | |
Design Infrastructure.Assessment.John Holland - Signals Design - Designer |
NOTE: The uploaded document for this competency is expected to be verified by the relevant assessor / subject matter expert rather than a Pegasus processing team member. This document will correctly go through as 'pending' and ready for verification to the relevant assessor when the applicant has completed all mandatory uploads (exclusive of Statement of Competency upload) and then uses the 'Apply for assessment' option (against the statement of competency file section) to submit the entire application through to a nominated assessor. | The assessor of this file (and role) will enter any required issue or expiration dates when verifying the file. |
Competency | Competency Requirements | Upload Requirements | Examples |
---|---|---|---|
Engineering & Design.Work Experience.Evidence of where you developed engineering solutions | Submit all evidence assessed that is relevant to this role. Options for the demonstration of competency could be:
| ||
Engineering & Design.Work Experience.Identify constraints on potential eng solutions | Submit all evidence assessed that is relevant to this role. Options for the demonstration of competency could be:
| ||
Engineering & Design.Work Experience.Evidence of Interpreting and scoping design requirements | Submit all evidence assessed that is relevant to this role. Options for the demonstration of competency could be:
| ||
Engineering & Design.Work Experience.Evidence of implementation of planning and design processes | Submit all evidence assessed that is relevant to this role. Options for the demonstration of competency could be:
| ||
Engineering & Design.Work Experience.Prepared proposals including advice on latest technology | Submit all evidence assessed that is relevant to this role. Options for the demonstration of competency could be:
| ||
Engineering & Design.Work Experience.Prepare/maintain documentation for design process | Submit all evidence assessed that is relevant to this role. Options for the demonstration of competency could be:
| ||
Engineering & Design.Work Experience.Contribute to engineering business strategies | Submit all evidence assessed that is relevant to this role. Options for the demonstration of competency could be:
| ||
Engineering & Design.Work Experience.Evidence of when you reviewed a design to achieve acceptance | Submit all evidence assessed that is relevant to this role. Options for the demonstration of competency could be:
| ||
Engineering & Design.Work Experience.Validating a design | Submit all evidence assessed that is relevant to this role. Options for the demonstration of competency could be:
| ||
Engineering & Design.Work Experience.evidence of monitored eng business performance | Submit all evidence assessed that is relevant to this role. Options for the demonstration of competency could be:
| ||
Engineering & Design.Work Experience.Implement engineering plans within a business | Submit all evidence assessed that is relevant to this role. Options for the demonstration of competency could be:
| ||
Engineering & Design.Work Experience.Evidence of situations of people management | Submit all evidence assessed that is relevant to this role. Options for the demonstration of competency could be:
| ||
Engineering & Design.Work Experience.Evidence of managed quality, safety, and risk | Submit all evidence assessed that is relevant to this role. Options for the demonstration of competency could be:
| ||
Engineering & Design.Work Experience.Evidence of management of timing and progress | Submit all evidence assessed that is relevant to this role. Options for the demonstration of competency could be:
| ||
Engineering & Design.Work Experience.Evidence of managed physical resources | Submit all evidence assessed that is relevant to this role. Options for the demonstration of competency could be:
| ||
Engineering & Design.Work Experience.Evidence of managed cost and procurement | Submit all evidence assessed that is relevant to this role. Options for the demonstration of competency could be:
| ||
Engineering & Design.Work Experience.Provide evidence of planning operations and system | Submit all evidence assessed that is relevant to this role. Options for the demonstration of competency could be:
| ||
Engineering & Design.Work Experience.Evidence of the finalisation of a project | Submit all evidence assessed that is relevant to this role. Options for the demonstration of competency could be:
| ||
Engineering & Design.Work Experience.Evidence of measured and documented ops & systems | Submit all evidence assessed that is relevant to this role. Options for the demonstration of competency could be:
|
Competency | Competency Requirements | Upload Requirements | Examples | |
---|---|---|---|---|
Engineering.Assessment.EDSME - Building Path 1 |
NOTE: The uploaded document for this competency is expected to be verified by the relevant assessor / subject matter expert rather than a Pegasus processing team member. This document will correctly go through as 'pending' and ready for verification to the relevant assessor when the applicant has completed all mandatory uploads (exclusive of Statement of Competency upload) and then uses the 'Apply for assessment' option (against the statement of competency file section) to submit the entire application through to a nominated assessor. | The assessor of this file (and role) will enter any required issue or expiration dates when verifying the file. | ||
Engineering.Assessment.EDSME - Building Path 2 |
NOTE: The uploaded document for this competency is expected to be verified by the relevant assessor / subject matter expert rather than a Pegasus processing team member. This document will correctly go through as 'pending' and ready for verification to the relevant assessor when the applicant has completed all mandatory uploads (exclusive of Statement of Competency upload) and then uses the 'Apply for assessment' option (against the statement of competency file section) to submit the entire application through to a nominated assessor. | The assessor of this file (and role) will enter any required issue or expiration dates when verifying the file. | ||
Engineering.Assessment.EDSME - Civil Path 1 |
NOTE: The uploaded document for this competency is expected to be verified by the relevant assessor / subject matter expert rather than a Pegasus processing team member. This document will correctly go through as 'pending' and ready for verification to the relevant assessor when the applicant has completed all mandatory uploads (exclusive of Statement of Competency upload) and then uses the 'Apply for assessment' option (against the statement of competency file section) to submit the entire application through to a nominated assessor. | The assessor of this file (and role) will enter any required issue or expiration dates when verifying the file. | ||
Engineering.Assessment.EDSME - Civil Path 2 |
NOTE: The uploaded document for this competency is expected to be verified by the relevant assessor / subject matter expert rather than a Pegasus processing team member. This document will correctly go through as 'pending' and ready for verification to the relevant assessor when the applicant has completed all mandatory uploads (exclusive of Statement of Competency upload) and then uses the 'Apply for assessment' option (against the statement of competency file section) to submit the entire application through to a nominated assessor. | The assessor of this file (and role) will enter any required issue or expiration dates when verifying the file. | ||
Engineering.Assessment.EDSME - Electrical Path 1 |
NOTE: The uploaded document for this competency is expected to be verified by the relevant assessor / subject matter expert rather than a Pegasus processing team member. This document will correctly go through as 'pending' and ready for verification to the relevant assessor when the applicant has completed all mandatory uploads (exclusive of Statement of Competency upload) and then uses the 'Apply for assessment' option (against the statement of competency file section) to submit the entire application through to a nominated assessor. | The assessor of this file (and role) will enter any required issue or expiration dates when verifying the file. | ||
Engineering.Assessment.EDSME - Electrical Path 2 |
NOTE: The uploaded document for this competency is expected to be verified by the relevant assessor / subject matter expert rather than a Pegasus processing team member. This document will correctly go through as 'pending' and ready for verification to the relevant assessor when the applicant has completed all mandatory uploads (exclusive of Statement of Competency upload) and then uses the 'Apply for assessment' option (against the statement of competency file section) to submit the entire application through to a nominated assessor. | The assessor of this file (and role) will enter any required issue or expiration dates when verifying the file. | ||
Engineering.Assessment.EDSME - Human Factors Path 1 |
NOTE: The uploaded document for this competency is expected to be verified by the relevant assessor / subject matter expert rather than a Pegasus processing team member. This document will correctly go through as 'pending' and ready for verification to the relevant assessor when the applicant has completed all mandatory uploads (exclusive of Statement of Competency upload) and then uses the 'Apply for assessment' option (against the statement of competency file section) to submit the entire application through to a nominated assessor. | The assessor of this file (and role) will enter any required issue or expiration dates when verifying the file. | ||
Engineering.Assessment.EDSME - Human Factors Path 2 |
NOTE: The uploaded document for this competency is expected to be verified by the relevant assessor / subject matter expert rather than a Pegasus processing team member. This document will correctly go through as 'pending' and ready for verification to the relevant assessor when the applicant has completed all mandatory uploads (exclusive of Statement of Competency upload) and then uses the 'Apply for assessment' option (against the statement of competency file section) to submit the entire application through to a nominated assessor. | The assessor of this file (and role) will enter any required issue or expiration dates when verifying the file. | ||
Engineering.Assessment.EDSME - Overhead Wiring Path 1 |
NOTE: The uploaded document for this competency is expected to be verified by the relevant assessor / subject matter expert rather than a Pegasus processing team member. This document will correctly go through as 'pending' and ready for verification to the relevant assessor when the applicant has completed all mandatory uploads (exclusive of Statement of Competency upload) and then uses the 'Apply for assessment' option (against the statement of competency file section) to submit the entire application through to a nominated assessor. . | The assessor of this file (and role) will enter any required issue or expiration dates when verifying the file. | ||
Engineering.Assessment.EDSME - Overhead Wiring Path 2 |
NOTE: The uploaded document for this competency is expected to be verified by the relevant assessor / subject matter expert rather than a Pegasus processing team member. This document will correctly go through as 'pending' and ready for verification to the relevant assessor when the applicant has completed all mandatory uploads (exclusive of Statement of Competency upload) and then uses the 'Apply for assessment' option (against the statement of competency file section) to submit the entire application through to a nominated assessor. | The assessor of this file (and role) will enter any required issue or expiration dates when verifying the file. | ||
Engineering.Assessment.EDSME - RAM Path 1 |
NOTE: The uploaded document for this competency is expected to be verified by the relevant assessor / subject matter expert rather than a Pegasus processing team member. This document will correctly go through as 'pending' and ready for verification to the relevant assessor when the applicant has completed all mandatory uploads (exclusive of Statement of Competency upload) and then uses the 'Apply for assessment' option (against the statement of competency file section) to submit the entire application through to a nominated assessor. | The assessor of this file (and role) will enter any required issue or expiration dates when verifying the file. | ||
Engineering.Assessment.EDSME - RAM Path 2 |
NOTE: The uploaded document for this competency is expected to be verified by the relevant assessor / subject matter expert rather than a Pegasus processing team member. This document will correctly go through as 'pending' and ready for verification to the relevant assessor when the applicant has completed all mandatory uploads (exclusive of Statement of Competency upload) and then uses the 'Apply for assessment' option (against the statement of competency file section) to submit the entire application through to a nominated assessor. | The assessor of this file (and role) will enter any required issue or expiration dates when verifying the file. | ||
Engineering.Assessment.EDSME - Rollingstock Path 1 |
NOTE: The uploaded document for this competency is expected to be verified by the relevant assessor / subject matter expert rather than a Pegasus processing team member. This document will correctly go through as 'pending' and ready for verification to the relevant assessor when the applicant has completed all mandatory uploads (exclusive of Statement of Competency upload) and then uses the 'Apply for assessment' option (against the statement of competency file section) to submit the entire application through to a nominated assessor. | The assessor of this file (and role) will enter any required issue or expiration dates when verifying the file. | ||
Engineering.Assessment.EDSME - Rollingstock Path 2 |
NOTE: The uploaded document for this competency is expected to be verified by the relevant assessor / subject matter expert rather than a Pegasus processing team member. This document will correctly go through as 'pending' and ready for verification to the relevant assessor when the applicant has completed all mandatory uploads (exclusive of Statement of Competency upload) and then uses the 'Apply for assessment' option (against the statement of competency file section) to submit the entire application through to a nominated assessor. | The assessor of this file (and role) will enter any required issue or expiration dates when verifying the file. | ||
Engineering.Assessment.EDSME - Signalling and Communications Path 1 |
NOTE: The uploaded document for this competency is expected to be verified by the relevant assessor / subject matter expert rather than a Pegasus processing team member. This document will correctly go through as 'pending' and ready for verification to the relevant assessor when the applicant has completed all mandatory uploads (exclusive of Statement of Competency upload) and then uses the 'Apply for assessment' option (against the statement of competency file section) to submit the entire application through to a nominated assessor. | The assessor of this file (and role) will enter any required issue or expiration dates when verifying the file. | ||
Engineering.Assessment.EDSME - Signalling and Communications Path 2 |
NOTE: The uploaded document for this competency is expected to be verified by the relevant assessor / subject matter expert rather than a Pegasus processing team member. This document will correctly go through as 'pending' and ready for verification to the relevant assessor when the applicant has completed all mandatory uploads (exclusive of Statement of Competency upload) and then uses the 'Apply for assessment' option (against the statement of competency file section) to submit the entire application through to a nominated assessor. | The assessor of this file (and role) will enter any required issue or expiration dates when verifying the file. | ||
Engineering.Assessment.EDSME - Substations Path 1 |
NOTE: The uploaded document for this competency is expected to be verified by the relevant assessor / subject matter expert rather than a Pegasus processing team member. This document will correctly go through as 'pending' and ready for verification to the relevant assessor when the applicant has completed all mandatory uploads (exclusive of Statement of Competency upload) and then uses the 'Apply for assessment' option (against the statement of competency file section) to submit the entire application through to a nominated assessor. | The assessor of this file (and role) will enter any required issue or expiration dates when verifying the file. | ||
Engineering.Assessment.EDSME - Substations Path 2 |
NOTE: The uploaded document for this competency is expected to be verified by the relevant assessor / subject matter expert rather than a Pegasus processing team member. This document will correctly go through as 'pending' and ready for verification to the relevant assessor when the applicant has completed all mandatory uploads (exclusive of Statement of Competency upload) and then uses the 'Apply for assessment' option (against the statement of competency file section) to submit the entire application through to a nominated assessor. | The assessor of this file (and role) will enter any required issue or expiration dates when verifying the file. | ||
Engineering.Assessment.EDSME - Survey Path 1 |
NOTE: The uploaded document for this competency is expected to be verified by the relevant assessor / subject matter expert rather than a Pegasus processing team member. This document will correctly go through as 'pending' and ready for verification to the relevant assessor when the applicant has completed all mandatory uploads (exclusive of Statement of Competency upload) and then uses the 'Apply for assessment' option (against the statement of competency file section) to submit the entire application through to a nominated assessor. | The assessor of this file (and role) will enter any required issue or expiration dates when verifying the file. | ||
Engineering.Assessment.EDSME - Survey Path 2 |
NOTE: The uploaded document for this competency is expected to be verified by the relevant assessor / subject matter expert rather than a Pegasus processing team member. This document will correctly go through as 'pending' and ready for verification to the relevant assessor when the applicant has completed all mandatory uploads (exclusive of Statement of Competency upload) and then uses the 'Apply for assessment' option (against the statement of competency file section) to submit the entire application through to a nominated assessor. | The assessor of this file (and role) will enter any required issue or expiration dates when verifying the file. | ||
Engineering.Assessment.EDSME - System Assurance Safety Path 1 |
NOTE: The uploaded document for this competency is expected to be verified by the relevant assessor / subject matter expert rather than a Pegasus processing team member. This document will correctly go through as 'pending' and ready for verification to the relevant assessor when the applicant has completed all mandatory uploads (exclusive of Statement of Competency upload) and then uses the 'Apply for assessment' option (against the statement of competency file section) to submit the entire application through to a nominated assessor. | The assessor of this file (and role) will enter any required issue or expiration dates when verifying the file. | ||
Engineering.Assessment.EDSME - System Assurance Safety Path 2 |
NOTE: The uploaded document for this competency is expected to be verified by the relevant assessor / subject matter expert rather than a Pegasus processing team member. This document will correctly go through as 'pending' and ready for verification to the relevant assessor when the applicant has completed all mandatory uploads (exclusive of Statement of Competency upload) and then uses the 'Apply for assessment' option (against the statement of competency file section) to submit the entire application through to a nominated assessor. | The assessor of this file (and role) will enter any required issue or expiration dates when verifying the file. | ||
Engineering.Assessment.EDSME - System Modelling and Analysis Path 1 |
NOTE: The uploaded document for this competency is expected to be verified by the relevant assessor / subject matter expert rather than a Pegasus processing team member. This document will correctly go through as 'pending' and ready for verification to the relevant assessor when the applicant has completed all mandatory uploads (exclusive of Statement of Competency upload) and then uses the 'Apply for assessment' option (against the statement of competency file section) to submit the entire application through to a nominated assessor. | The assessor of this file (and role) will enter any required issue or expiration dates when verifying the file. | ||
Engineering.Assessment.EDSME - System Modelling and Analysis Path 2 |
NOTE: The uploaded document for this competency is expected to be verified by the relevant assessor / subject matter expert rather than a Pegasus processing team member. This document will correctly go through as 'pending' and ready for verification to the relevant assessor when the applicant has completed all mandatory uploads (exclusive of Statement of Competency upload) and then uses the 'Apply for assessment' option (against the statement of competency file section) to submit the entire application through to a nominated assessor. | The assessor of this file (and role) will enter any required issue or expiration dates when verifying the file. | ||
Engineering.Assessment.EDSME - Systems Integration Path 1 |
NOTE: The uploaded document for this competency is expected to be verified by the relevant assessor / subject matter expert rather than a Pegasus processing team member. This document will correctly go through as 'pending' and ready for verification to the relevant assessor when the applicant has completed all mandatory uploads (exclusive of Statement of Competency upload) and then uses the 'Apply for assessment' option (against the statement of competency file section) to submit the entire application through to a nominated assessor. | The assessor of this file (and role) will enter any required issue or expiration dates when verifying the file. | ||
Engineering.Assessment.EDSME - Systems Integration Path 2 |
NOTE: The uploaded document for this competency is expected to be verified by the relevant assessor / subject matter expert rather than a Pegasus processing team member. This document will correctly go through as 'pending' and ready for verification to the relevant assessor when the applicant has completed all mandatory uploads (exclusive of Statement of Competency upload) and then uses the 'Apply for assessment' option (against the statement of competency file section) to submit the entire application through to a nominated assessor. | The assessor of this file (and role) will enter any required issue or expiration dates when verifying the file. | ||
Engineering.Assessment.EDSME - Track Path 1 |
NOTE: The uploaded document for this competency is expected to be verified by the relevant assessor / subject matter expert rather than a Pegasus processing team member. This document will correctly go through as 'pending' and ready for verification to the relevant assessor when the applicant has completed all mandatory uploads (exclusive of Statement of Competency upload) and then uses the 'Apply for assessment' option (against the statement of competency file section) to submit the entire application through to a nominated assessor. | The assessor of this file (and role) will enter any required issue or expiration dates when verifying the file. | ||
Engineering.Assessment.EDSME - Track Path 2 |
NOTE: The uploaded document for this competency is expected to be verified by the relevant assessor / subject matter expert rather than a Pegasus processing team member. This document will correctly go through as 'pending' and ready for verification to the relevant assessor when the applicant has completed all mandatory uploads (exclusive of Statement of Competency upload) and then uses the 'Apply for assessment' option (against the statement of competency file section) to submit the entire application through to a nominated assessor. | The assessor of this file (and role) will enter any required issue or expiration dates when verifying the file. | ||
Engineering.Assessment.EDSME - Tunneling Path 1 |
NOTE: The uploaded document for this competency is expected to be verified by the relevant assessor / subject matter expert rather than a Pegasus processing team member. This document will correctly go through as 'pending' and ready for verification to the relevant assessor when the applicant has completed all mandatory uploads (exclusive of Statement of Competency upload) and then uses the 'Apply for assessment' option (against the statement of competency file section) to submit the entire application through to a nominated assessor. |
| ||
Engineering.Assessment.EDSME - Tunneling Path 2 |
NOTE: The uploaded document for this competency is expected to be verified by the relevant assessor / subject matter expert rather than a Pegasus processing team member. This document will correctly go through as 'pending' and ready for verification to the relevant assessor when the applicant has completed all mandatory uploads (exclusive of Statement of Competency upload) and then uses the 'Apply for assessment' option (against the statement of competency file section) to submit the entire application through to a nominated assessor. | The assessor of this file (and role) will enter any required issue or expiration dates when verifying the file. | ||
Engineering.Assessment.EDSME - Verification and Validation Path 1 |
NOTE: The uploaded document for this competency is expected to be verified by the relevant assessor / subject matter expert rather than a Pegasus processing team member. This document will correctly go through as 'pending' and ready for verification to the relevant assessor when the applicant has completed all mandatory uploads (exclusive of Statement of Competency upload) and then uses the 'Apply for assessment' option (against the statement of competency file section) to submit the entire application through to a nominated assessor. | The assessor of this file (and role) will enter any required issue or expiration dates when verifying the file. | ||
Engineering.Assessment.EDSME - Verification and Validation Path 2 |
NOTE: The uploaded document for this competency is expected to be verified by the relevant assessor / subject matter expert rather than a Pegasus processing team member. This document will correctly go through as 'pending' and ready for verification to the relevant assessor when the applicant has completed all mandatory uploads (exclusive of Statement of Competency upload) and then uses the 'Apply for assessment' option (against the statement of competency file section) to submit the entire application through to a nominated assessor. | The assessor of this file (and role) will enter any required issue or expiration dates when verifying the file. |
Competency | Competency Requirements | Upload Requirements | Examples |
---|---|---|---|
Project Management.Assessment.John Holland - Chief Engineer |
NOTE: The uploaded document for this competency is expected to be verified by the relevant assessor / subject matter expert rather than a Pegasus processing team member. This document will correctly go through as 'pending' and ready for verification to the relevant assessor when the applicant has completed all mandatory uploads (exclusive of Statement of Competency upload) and then uses the 'Apply for assessment' option (against the statement of competency file section) to submit the entire application through to a nominated assessor. | The assessor of this file (and role) will enter any required issue or expiration dates when verifying the file | |
Project Management.Assessment.John Holland - Project Director Path 1 |
NOTE: The uploaded document for this competency is expected to be verified by the relevant assessor / subject matter expert rather than a Pegasus processing team member. This document will correctly go through as 'pending' and ready for verification to the relevant assessor when the applicant has completed all mandatory uploads (exclusive of Statement of Competency upload) and then uses the 'Apply for assessment' option (against the statement of competency file section) to submit the entire application through to a nominated assessor. | The assessor of this file (and role) will enter any required issue or expiration dates when verifying the file | |
Project Management.Assessment.John Holland - Project Director Path 2 |
NOTE: The uploaded document for this competency is expected to be verified by the relevant assessor / subject matter expert rather than a Pegasus processing team member. This document will correctly go through as 'pending' and ready for verification to the relevant assessor when the applicant has completed all mandatory uploads (exclusive of Statement of Competency upload) and then uses the 'Apply for assessment' option (against the statement of competency file section) to submit the entire application through to a nominated assessor. | The assessor of this file (and role) will enter any required issue or expiration dates when verifying the file | |
Project Management.Assessment.John Holland - Project Engineer Path 1 |
NOTE: The uploaded document for this competency is expected to be verified by the relevant assessor / subject matter expert rather than a Pegasus processing team member. This document will correctly go through as 'pending' and ready for verification to the relevant assessor when the applicant has completed all mandatory uploads (exclusive of Statement of Competency upload) and then uses the 'Apply for assessment' option (against the statement of competency file section) to submit the entire application through to a nominated assessor. | The assessor of this file (and role) will enter any required issue or expiration dates when verifying the file | |
Project Management.Assessment.John Holland - Project Engineer Path 2 |
NOTE: The uploaded document for this competency is expected to be verified by the relevant assessor / subject matter expert rather than a Pegasus processing team member. This document will correctly go through as 'pending' and ready for verification to the relevant assessor when the applicant has completed all mandatory uploads (exclusive of Statement of Competency upload) and then uses the 'Apply for assessment' option (against the statement of competency file section) to submit the entire application through to a nominated assessor. | The assessor of this file (and role) will enter any required issue or expiration dates when verifying the file | |
Project Management.Assessment.John Holland - Project Manager Path 1 |
NOTE: The uploaded document for this competency is expected to be verified by the relevant assessor / subject matter expert rather than a Pegasus processing team member. This document will correctly go through as 'pending' and ready for verification to the relevant assessor when the applicant has completed all mandatory uploads (exclusive of Statement of Competency upload) and then uses the 'Apply for assessment' option (against the statement of competency file section) to submit the entire application through to a nominated assessor. | The assessor of this file (and role) will enter any required issue or expiration dates when verifying the file | |
Project Management.Assessment.John Holland - Project Manager Path 2 |
NOTE: The uploaded document for this competency is expected to be verified by the relevant assessor / subject matter expert rather than a Pegasus processing team member. This document will correctly go through as 'pending' and ready for verification to the relevant assessor when the applicant has completed all mandatory uploads (exclusive of Statement of Competency upload) and then uses the 'Apply for assessment' option (against the statement of competency file section) to submit the entire application through to a nominated assessor. | The assessor of this file (and role) will enter any required issue or expiration dates when verifying the file | |
Project Management.Assessment.John Holland - Project Officer/Technician/Grad |
NOTE: The uploaded document for this competency is expected to be verified by the relevant assessor / subject matter expert rather than a Pegasus processing team member. This document will correctly go through as 'pending' and ready for verification to the relevant assessor when the applicant has completed all mandatory uploads (exclusive of Statement of Competency upload) and then uses the 'Apply for assessment' option (against the statement of competency file section) to submit the entire application through to a nominated assessor. | The assessor of this file (and role) will enter any required issue or expiration dates when verifying the file | |
Project Management.Assessment.John Holland - RAM Engineer |
NOTE: The uploaded document for this competency is expected to be verified by the relevant assessor / subject matter expert rather than a Pegasus processing team member. This document will correctly go through as 'pending' and ready for verification to the relevant assessor when the applicant has completed all mandatory uploads (exclusive of Statement of Competency upload) and then uses the 'Apply for assessment' option (against the statement of competency file section) to submit the entire application through to a nominated assessor. | The assessor of this file (and role) will enter any required issue or expiration dates when verifying the file | |
Project Management.Assessment.John Holland - Senior Project Manager Path 1 |
NOTE: The uploaded document for this competency is expected to be verified by the relevant assessor / subject matter expert rather than a Pegasus processing team member. This document will correctly go through as 'pending' and ready for verification to the relevant assessor when the applicant has completed all mandatory uploads (exclusive of Statement of Competency upload) and then uses the 'Apply for assessment' option (against the statement of competency file section) to submit the entire application through to a nominated assessor. |
| |
Project Management.Assessment.John Holland - Senior Project Manager Path 2 |
NOTE: The uploaded document for this competency is expected to be verified by the relevant assessor / subject matter expert rather than a Pegasus processing team member. This document will correctly go through as 'pending' and ready for verification to the relevant assessor when the applicant has completed all mandatory uploads (exclusive of Statement of Competency upload) and then uses the 'Apply for assessment' option (against the statement of competency file section) to submit the entire application through to a nominated assessor. | The assessor of this file (and role) will enter any required issue or expiration dates when verifying the file | |
Project Management.Certificate.SOC - John Holland - Senior Project Manager (Path 1 |
|
|
Competency | Competency Requirements | Upload Requirements | Examples | |
---|---|---|---|---|
Scaffolder.VOC.JH - Advanced Scaffolder |
|
| ||
Operator Backhoe.VOC.JH - Backhoe |
|
| ||
Operator Excavator.VOC.JH - Ballast Regulating Blade (Plough)Attachement Excavator |
|
| ||
(GRP) Scaffolder.VOC.Basic, Intermediate, Advanced |
|
| ||
Operator Crane Bridge & Gantry.VOC.JH - Bridge/gantry crane |
|
| ||
Operator Excavator.VOC.JH - Bucket Attachment - Excavator |
|
| ||
Operator Front End Loader.VOC.JH - Bucket Attachment - Front End Loader |
|
| ||
Operator.VOC.JH - Remote Operated Ballast Wagon |
|
| ||
Dogger.VOC.JH - Dogging |
|
| ||
Operator Excavator.VOC.JH - Bucket Attachment - Excavator |
|
| ||
Training & Assessment.VOC.JH - Excavator |
|
| ||
Operator Forklift.VOC.JH - Fork Positioner Attachment Forklift |
|
| ||
Operator Front End Loader.VOC.JH - Fork/Tines Attachment Front End Loader |
|
| ||
Rail.VOC.JH - Forklift |
|
| ||
Operator Excavator.VOC.JH - Forks/Tines Attachment Excavator |
|
| ||
Training & Assessment.VOC.JH - Front End Loader |
|
| ||
Operator Crane Bridge & Gantry.VOC.JH - Gantry 30T Viccon Thai |
|
| ||
Training & Assessment.VOC.JH - Grader |
|
| ||
Operator.VOC.JH - Harsco NTC Sleeper Gantry |
|
| ||
Operator Front End Load Skid Steer.Letter of Competency.JH - VOC - Bucket Attachment Skid Steer |
|
| ||
Operator Front End Load Skid Steer.Letter of Competency.JH - VOC - Forks Attachment Skid Steer |
|
| ||
Operator Front End Load Skid Steer.Letter of Competency.JH - VOC - Jib Attachment Skid Steer |
|
| ||
Operator Forklift.Letter of Competency.JH - VOC - Tow Attachment Forklift |
|
| ||
Operator Front End Loader.VOC.JH - Jib Attachment Front End Loader |
|
| ||
Operator.VOC.JH - Mobile Flashbutt Welder Doosan DX170W |
|
| ||
(GRP) Operator Dump Truck.VOC.Dump Truck |
|
| ||
Operator Crane.VOC.JH - Non-slewing mobile crane – more than 3 tonnes |
|
| ||
Rail.VOC.JH - Order Picking Forklift Truck |
|
| ||
Rigger.VOC.JH - Advanced rigger |
|
| ||
Training & Assessment.VOC.JH - Roller |
|
| ||
Training & Assessment.VOC.JH - Side Tipper Wagon |
|
| ||
Training & Assessment.VOC.JH - Skid Steer |
|
| ||
Operator Excavator.VOC.JH - Sleeper Grab Attachment Excavator |
|
| ||
Operator Crane.VOC.JH - Slewing mobile crane 100 tonnes or less |
|
| ||
Training & Assessment.VOC.JH - Slewing mobile crane 20 tonnes or less |
|
| ||
Operator Crane.VOC.JH - Slewing mobile crane 60 tonnes or less |
|
| ||
Operator Crane.VOC.JH - Slewing mobile crane over 100 tonnes |
|
| ||
Operator Excavator.VOC.JH - Tamping Head Attachment Excavator |
|
| ||
Operator Crane.VOC.JH - Telescopic Handler |
|
| ||
Operator Crane.VOC.JH - Telescopic Handler |
|
| ||
Training & Assessment.VOC.JH - Vehicle loading crane - 10 m tonnes or more - VOC |
|
| ||
Operator Excavator.VOC.JH - Cutter Bar Attachment Excavator |
|
| ||
Operator Forklift.VOC.JH - Drum Lifter Attachment Forklift |
|
| ||
Operator Excavator.Letter of Competency.JH - VOC - Forestry Mulcher Attachment - Excavator |
|
| ||
Operator Forklift.VOC.JH- Jib Attachment Forklift |
|
| ||
Operator.VOC.JH - Manual Operated Ballast Wagon |
|
| ||
Operator Forklift.VOC.JH - Mancage Attachment Forklift |
|
| ||
Operator Forklift.VOC.JH - Slippers Attachment Forklift |
|
| ||
Operator Front End Loader.Letter of Competency.JH - VOC - Sweeper Attachment - Skid Steer |
|
| ||
Operator Excavator.Letter of Competency.JH - VOC - Tamper Attachment - Excavator |
|
| ||
Operator Excavator.Letter of Competency.JH - VOC - Undercutter Attachment - Excavator |
|
| ||
Operator Crane.VOC.JH - Vehicle Loading crane - <10 tonne |
|
| ||
Operator.VOC.JH – Plough Attachment Ballast Wagon |
|
| ||
Operator Excavator.Letter of Competency.JH - VOC - Forestry Mulcher Attachment - Excavator |
|
| ||
Operator Front End Loader.Letter of Competency.JH - VOC - Sweeper Attachment - Skid Steer |
|
| ||
Operator Excavator.Letter of Competency.JH - VOC - Tamper Attachment - Excavator |
|
| ||
Operator Excavator.Letter of Competency.JH - VOC - Undercutter Attachment - Excavator |
|
| ||
Rail.Certificate of Competency.Roy Hill Safeworking VOC - Hi Rail Machinery Operator |
|
| ||
Rail.Certificate of Competency.Roy Hill Safeworking VOC - Track Machine Operator |
|
| ||
Rail.Certificate of Competency.Roy Hill Safeworking VOC – Traffic Liaison Officer |
|
| ||
Rail.Certificate of Competency.Roy Hill Safeworking VOC - Train Controller |
|
| ||
Rail.Certificate of Competency.Roy Hill Safeworking VOC - Train Driver |
|
| ||
Rail.Certificate of Competency.Roy Hill Safeworking VOC - Train Pilot Propelling |
|
| ||
Rail.Certificate of Competency.Roy Hill Safeworking VOC - Worksite Supervisor |
|
|
Competency | Competency Requirements | Upload Requirements | Examples |
---|---|---|---|
Safety.Assessment.Corporate Rail Safety Manager - Support Services (Path 1) |
|
| |
Safety.Assessment.Corporate Rail Safety Manager - Support Services (Path 2) |
|
| |
Safety.Assessment.TfNSW Corporate Rail Safety Manager Support Services Path 1 |
|
| |
Safety.Assessment.TfNSW Corporate Rail Safety Manager Support Services Path 2 |
|
| |
Safety.Assessment.TfNSW Project Rail Safety Coordinator (Path 1) |
|
| |
Safety.Assessment.TfNSW Project Rail Safety Coordinator (Path 2) |
|
| |
Safety.Assessment.TfNSW Project Rail Safety Coordinator (Path 3) |
|
| |
Safety.Assessment.TfNSW Project Rail Safety Manager (Path 1) |
|
| |
Safety.Assessment.TfNSW Project Rail Safety Manager (Path 2) |
|
| |
Safety.Assessment.TfNSW Project Rail Safety Manager (Path 3) |
|
|
Competency | Competency Requirements | Upload Requirements | Examples |
---|---|---|---|
Manager Project.Work Experience.Evidence of integration of all functions of PM | Applicants name must be displayed on the uploaded evidence
Evidence must display what is deemed an adequate amount of relevant experience as deemed fit by the assessor / Subject Matter Expert (SME) | The assessor of this file (and role) will enter any required issue or expiration dates when verifying the file. | |
Manager Project.Work Experience.Evidence of managed cost and budget issues (private) | Applicants name must be displayed on the uploaded evidence
| The assessor of this file (and role) will enter any required issue or expiration dates when verifying the file. | |
Manager Project.Work Experience.Evidence of managed quality aspects of a project | Applicants name must be displayed on the uploaded evidence
Evidence must display what is deemed an adequate amount of relevant experience as deemed fit by the assessor / Subject Matter Expert (SME) | The assessor of this file (and role) will enter any required issue or expiration dates when verifying the file. | |
Manager Project.Work Experience.Evidence of management of comms in a project | Applicants name must be displayed on the uploaded evidence
Evidence must display what is deemed an adequate amount of relevant experience as deemed fit by the assessor / Subject Matter Expert (SME) | The assessor of this file (and role) will enter any required issue or expiration dates when verifying the file. | |
Manager Project.Work Experience.Evidence of management of timing and progress | Applicants name must be displayed on the uploaded evidence
| The assessor of this file (and role) will enter any required issue or expiration dates when verifying the file. | |
Manager Project.Work Experience.Evidence of mngd contractual & procurement issues | Applicants name must be displayed on the uploaded evidence
Evidence must display what is deemed an adequate amount of relevant experience as deemed fit by the assessor / Subject Matter Expert (SME) | The assessor of this file (and role) will enter any required issue or expiration dates when verifying the file. | |
Manager Project.Work Experience.Evidence of when you have managed project risk | Applicants name must be displayed on the uploaded evidence
Evidence must display what is deemed an adequate amount of relevant experience as deemed fit by the assessor / Subject Matter Expert (SME) | The assessor of this file (and role) will enter any required issue or expiration dates when verifying the file. | |
Manager Project.Work Experience.Situations when you have managed project staffing | Applicants name must be displayed on the uploaded evidence
| The assessor of this file (and role) will enter any required issue or expiration dates when verifying the file. |